热词
    • 31. 发明专利
    • Construction method for abutment with reconstruction for bridge and its abutment structure
    • 用于重建桥梁及其结构结构的建筑施工方法
    • JP2005068816A
    • 2005-03-17
    • JP2003300152
    • 2003-08-25
    • East Japan Railway CoRailway Technical Res Inst東日本旅客鉄道株式会社財団法人鉄道総合技術研究所
    • TATEYAMA MASARUWATANABE KENJINOZAWA SHINICHIROFUJISAWA HAJIMEOTA MASAHIKO
    • E02D27/12E01D19/02E01D22/00E01D24/00E02D5/04E02D5/18E02D27/32
    • PROBLEM TO BE SOLVED: To provide a construction method for an abutment with the reconstruction of a bridge extremely inhibiting the increase of the length of the bridge as compared to the old bridge while being capable of strengthening the strength of the abutment in the construction of the abutment with the reconstruction of the bridge and its abutment structure.
      SOLUTION: (a) An earth retaining wall 4 is placed to the rear of the existing abutment 2, (b) an excavation at a small stage is conducted and (c) a tensile reinforcing material 5 in which a tensile core material is inserted is driven to the earth retaining wall 4 of an excavating surface. (d) Processes in (b) and (c) are repeated, and a ground is excavated up to a specified depth while the tensile reinforcing material is driven, (e) a foundation pile 6 is installed in a space emptied by the excavation, and (f) the new abutment is constructed by placing abutment concrete so as to be connected to the tensile reinforcing material 5 and the earth retaining wall 4. (g) The existing abutment is removed, and (h) a new girder is stretched over the new abutment.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种用于与桥梁的重建抵接的施工方法,其极大地抑制了与旧桥相比桥的长度的增加,同时能够增强桥的刚度 用桥梁及桥基结构重建桥基的构造。 解决方案:(a)将一个挡土墙4放置在现有基座2的后部,(b)进行小阶段的挖掘,(c)拉伸增强材料5,其中拉伸芯材 被插入到挖掘面的挡土墙4上。 (d)重复(b)和(c)中的方法,并且在拉伸增强材料被驱动的同时将地面挖掘达指定的深度,(e)将基础桩6安装在由挖掘中排空的空间中, (f)通过将邻接混凝土置于与拉伸增强材料5和土挡土墙4连接的方式构造新的基台。(g)将现有的桥基移除,并且(h)将新的大梁拉伸 新的基台。 版权所有(C)2005,JPO&NCIPI
    • 33. 发明专利
    • CONCRETE SLEEPER
    • JPH09256302A
    • 1997-09-30
    • JP7168896
    • 1996-03-27
    • RAILWAY TECHNICAL RES INST
    • TATEYAMA MASARU
    • E01B3/28B28B7/16
    • PROBLEM TO BE SOLVED: To increase the frictional resistance of ballast and prevent the level difference of rails due to the fluidity of ballast, by providing a rugged surface on which the ballast is fitted, on the contact surface of concrete sleepers with the ballast. SOLUTION: A rugged face on which ballast 2 is fitted, is provided on the bottom surface of concrete sleepers 1 of a rail road or the ballast is buried therein or stuck thereto. A rugged face is provided on the surface of a form corresponding to the bottom face of a sleeper and then concrete is placed to form projections and recession. And foamed styrol is laid on the bottom of a form and the ballast 2 is pressed therein and then concrete is placed in a thin ballast layer, in order to bury the ballast 2 on the bottom face of sleepers. Projections 5 are formed on the bottom face of concrete sleepers 1 in the right- angled direction against the acting direction of sliding forces to increase the receive area of pressure on the bottom face of sleepers. In this way, the level difference of rails are reduced.
    • 37. 发明专利
    • CONSTRUCTION METHOD FOR LIGHT WEIGHT BANKING
    • JPH0387417A
    • 1991-04-12
    • JP22283789
    • 1989-08-31
    • RAILWAY TECHNICAL RES INST
    • TATEYAMA MASARUMURATA OSAMUYASUDA YUSAKU
    • E02D17/18
    • PURPOSE:To make deformation small in quantity as well as to secure stability without impairing right-weight and easiness in execution by arranging materials which are comparatively high in compression stiffness within the inside of a light weight banking composed of materials small in compression stiffness to make it a composite structure with the materials for light weight banking. CONSTITUTION:The ground surface is excavated to a specified depth, a bottom concrete 17 is set up on the face of excavation 18, and furthermore, foamed styrol blocks 11 are piled up to a specified height. In the second place, wall panels 14 and 14 are set up, a plurality of vertical holes are concurrently provided for foamed styrol blocks 16 with a specified density by means of heating wires and the like. And said holes are filled with materials such as concrete, mortar, plastics and the like which are comparatively high in compression stiffness so that pile bodies 15 and 15 are thereby formed. This therefore permits vertical load applied after a banking has been constructed, to be mostly taken care of by the pile bodies 15 and 15 high in compression stiffness, thereby making it possible to make the quantity of deformation small to a lesser extent.
    • 40. 发明专利
    • Soil retaining construction method using large-sized sandbag and restraining pile together and soil retaining structure by the method
    • 使用大尺寸沙粒的土壤保持施工方法和通过该方法限制桩与土体保持结构
    • JP2010203114A
    • 2010-09-16
    • JP2009048684
    • 2009-03-03
    • Integrated Geotechnology Institute LtdRailway Technical Res Inst株式会社複合技術研究所財団法人鉄道総合技術研究所
    • TATEYAMA MASARUKOJIMA KENICHIGOTO KOJITAMURA YUKIHIKO
    • E02D17/18E02B3/04E02D17/20
    • PROBLEM TO BE SOLVED: To provide a soil retaining construction method in which a large-sized sandbag and a restraining pile are used together which can provide sufficient strength thereto as a structure by using the large-sized sandbag and the restraining pile together in a short-period construction and which can reduce cost for recovery and a construction period, and also provide a soil retaining structure by the method.
      SOLUTION: In this soil retaining construction method in which a large-sized sandbag and a restraining pile are used together, the collapsed surface 3A of the affected part 3 of an affected soil structure is reformed, a plurality of large-sized sandbags 5 which are heaped up and have respective vertical through-holes 5A and a restraining pile 4 inserted into the through-holes 5A are disposed at the affected part 3, a filler 6 is filled between the restraining pile 4 and the large-sized soil sandbags 5, a back-fill soil 7 is back-filled to the rear surfaces of the large-sized soil sandbags 5, and a surface protective work 8 is applied to the surfaces of the large-sized soil sandbags 5.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 待解决的问题:提供一种土体保持施工方法,其中大型沙袋和约束桩一起使用,通过使用大型沙袋和约束桩在一起可以提供足够的强度作为结构 在短期施工中,可以降低回收成本和施工期,并通过该方法提供土壤保持结构。 解决方案:在大型沙袋和约束桩一起使用的这种保土施工方法中,受影响土壤结构的受影响部分3的塌陷面3A被重整,多个大型沙袋 5并且具有各自的垂直通孔5A和插入到通孔5A中的约束桩4设置在受影响部分3处,填料6填充在约束桩4和大型土沙袋之间 如图5所示,背面填充土壤7被填充到大型土沙袋5的后表面,并且将表面保护作业8施加到大尺寸土沙袋5的表面。版权所有: (C)2010,JPO&INPIT