热词
    • 31. 发明授权
    • Continuous casting mould
    • 连铸模具
    • US06273177B1
    • 2001-08-14
    • US09147994
    • 2000-01-12
    • Fritz-Peter Pleschiutschnigg
    • Fritz-Peter Pleschiutschnigg
    • B22D1100
    • B22D11/055
    • A continuous casting mold for casting strands, preferably of steel, includes mold plates and water boxes, and a connecting plate for connecting each mold plate to one of the water boxes. A water cooling system is formed by water conduits between the mold plates and the water boxes, wherein the water conduits are arranged in a side of the water box facing the mold plate and not in the mold plate. The water box and the connecting plate of the water box are joined together by connecting screws and nuts, wherein the connecting screws are arranged in the mold plate and the nuts are arranged on the water box. The connecting screws have internal cooling ducts and the internal cooling ducts are connected to the water conduits.
    • 用于铸造线材,优选钢的连续铸造模具包括模板和水箱,以及用于将每个模板连接到其中一个水箱的连接板。 水冷系统由模具板和水箱之间的水导管形成,其中水管布置在水箱的面对模板的一侧而不在模板中。 水箱和水箱的连接板通过连接螺钉和螺母连接在一起,其中连接螺钉布置在模板中,螺母布置在水箱上。 连接螺丝具有内部冷却管道,内部冷却管道连接到水管道。
    • 32. 发明授权
    • Method for manufacturing steel
    • 制钢方法
    • US06264723B1
    • 2001-07-24
    • US09326403
    • 1999-06-04
    • Fritz-Peter Pleschiutschnigg
    • Fritz-Peter Pleschiutschnigg
    • C21B502
    • C21C5/5217C21B7/00Y02P10/216
    • A method and a plant for manufacturing steel in an electric steel furnace wherein the electric steel furnace is charged with at most 70% scrap and with at most 60% liquid pig iron obtained in a mini-blast furnace, and optionally with additional iron carriers, and wherein the mini-blast furnace is operated for producing the pig iron with iron pellets and/or coarse or lump ore and coke as well as coal. The melting process in the electric steel furnace is operated using electrical energy and by simultaneously using oxygen and injected coal. The plant for carrying out the method is composed of a mini-blast furnace and an electric steel furnace.
    • 一种用于在电炉钢中制造钢的方法和装置,其中电炉炉中装有至少70%的废料和至少60%的在微型高炉中得到的液态生铁,以及任选的另外的铁载体, 并且其中所述微型高炉用于生产具有铁丸和/或粗或块矿石和焦炭以及煤的生铁。 电炉中的熔化过程是使用电能,同时使用氧气和注入煤。 用于实施该方法的设备由微型高炉和电炉钢组成。
    • 33. 发明授权
    • Plate mold for producing steel billets
    • 用于生产钢坯的板模
    • US06176295B1
    • 2001-01-23
    • US09011344
    • 1998-03-11
    • Fritz-Peter Pleschiutschnigg
    • Fritz-Peter Pleschiutschnigg
    • B22D1104
    • B22D11/0408B22D11/055B22D11/22
    • The plate mold has water-cooled narrow side walls that can be clamped between broad side walls. The broad side walls have at least three adjacent and mutually independent cooling segments. The cooling segments are divided symmetrically relative to the central axis of the mold and have, in the region of the mold mouth, separate connections for the independent supply of a liquid coolant. The apparatus includes temperature sensors, an oscillation device, an actuator for adjusting the space between the narrow and broad side walls and a control device connected to the temperature sensors to control the oscillation device and the actuator.
    • 板模具具有水冷的窄侧壁,可以夹在宽的侧壁之间。 宽侧壁具有至少三个相邻和相互独立的冷却段。 冷却段相对于模具的中心轴对称地分开,并且在模具口区域中具有用于独立供应液体冷却剂的单独连接。 该装置包括温度传感器,振荡装置,用于调节窄侧壁和宽侧壁之间的空间的致动器以及连接到温度传感器以控制振荡装置和致动器的控制装置。
    • 40. 发明授权
    • Method and apparatus for producing thin slabs in a continuous casting plant
    • 连铸机生产薄板坯的方法和装置
    • US06536505B1
    • 2003-03-25
    • US09507288
    • 2000-02-18
    • Fritz-Peter Pleschiutschnigg
    • Fritz-Peter Pleschiutschnigg
    • B22D1112
    • B22D11/1206
    • A method and an apparatus for producing slabs in a continuous casting plant preferably equipped with a vertical mold, preferably for thin slab plants for casting preferably steel having, for example, a solidification thickness of 60 mm-120 mm, for example, 80 mm, and casting speeds of up to 10 m/min. and a maximum casting output of about 3 million tons per year. In a first vertically extending first segment 0 of a strand guide, exclusive strand reduction, also called casting and rolling, is carried out. The segment 1 arranged immediately underneath the first segment 0 carries out bending of the strand through several bending points into the inner circular arc. Prior to final solidification, the strand is bent back through several return bending points into the horizontal.
    • 一种在连铸设备中生产板坯的方法和装置,优选地配备有垂直模具,优选用于薄板坯装置,优选铸造,其具有例如60mm-120mm的凝固厚度,例如80mm, 铸造速度高达10米/分钟。 每年最大铸造产量约300万吨。 在股线引导件的第一垂直延伸的第一段0中,执行也称为铸造和轧制的专用股线还原。 紧接在第一区段0下方的区段1通过几个弯曲点进入内圆弧的弯曲。 在最终凝固之前,股线通过几个返回弯曲点向后弯曲成水平。