热词
    • 37. 发明专利
    • Junction structure of pile and upper structure
    • 结构和上部结构的结构结构
    • JP2014169577A
    • 2014-09-18
    • JP2013041965
    • 2013-03-04
    • Asahi Kasei Construction Materials Co Ltd旭化成建材株式会社Daitetsu Kogyo Kk大鉄工業株式会社
    • SUGANO TETSUYAIGARASHI TOSHIOHODAKA ASUKAFUKUDA SHUNKONFUJII YOSHITAKA
    • E02D27/00E02D5/28
    • PROBLEM TO BE SOLVED: To provide a junction structure of a pile and an upper structure that improves workability of insertion of an alignment rod fixed to an upper end of a pile head into a center hole of a top plate from below.SOLUTION: A cylindrical pipe 30 is employed for a junction structure of a pile and an upper structure, and a center hole 4c of a top plate 4 can be thereby set to an arbitrary size such that an alignment rod 16 can be easily inserted into the center hole 4c from below. Then the cylindrical pipe 30 can be used even to make a rattle of the top plate 4 with respect to a straight part 16d of the alignment rod 16 by filling a gap between the straight part 16d of the alignment rod 16 and a wall surface 4d of the center hole 4c. Especially, when a cylindrical sheath pipe 7 shaped to surround a periphery of a pile head 1A is fixed to the top plate 4, an operation to peep into the center hole of a pile head plate from below is disabled, which is effective.
    • 要解决的问题:提供一种桩和上部结构的接合结构,其提高固定在桩头上端的定位杆从下方插入顶板的中心孔的加工性。解决方案:圆柱形 管30用于桩和上部结构的接合结构,并且顶板4的中心孔4c可以被设置为任意尺寸,使得对准杆16可以容易地从中心孔4c插入到中心孔4c中 下面。 然后,通过填充对准棒16的直部16d和对准杆16的直线部分16d之间的间隙,圆柱形管30可以相对于对准杆16的直线部分16d平稳地使顶板4发出咔嗒声, 中心孔4c。 特别是,当形成为围绕桩头1A的周边的圆筒形鞘管7被固定到顶板4时,从下方窥视桩头板的中心孔的操作被禁用,这是有效的。
    • 38. 发明专利
    • Junction structure of pile and upper structure
    • 结构和上部结构的结构结构
    • JP2014169576A
    • 2014-09-18
    • JP2013041962
    • 2013-03-04
    • Asahi Kasei Construction Materials Co Ltd旭化成建材株式会社Daitetsu Kogyo Kk大鉄工業株式会社
    • SUGANO TETSUYAIGARASHI TOSHIOHODAKA ASUKAFUKUDA SHUNKONFUJII YOSHITAKA
    • E02D27/00E02D5/28
    • PROBLEM TO BE SOLVED: To provide a junction structure of a pile and an upper structure that facilitates an operation to position an alignment rod.SOLUTION: A junction structure of a pile and an upper structure employs a ring plate 11 for a pile head cap tool 10 including an alignment rod 16 extending in a perpendicular direction, so the alignment rod 16 is only moved in a horizontal direction for alignment by alignment rod horizontal positioning means 20 based upon the ring plate 11 placed in a horizontal posture. Alignment precision by the alignment rod 16 is thereby easily improved and an operation to position the alignment rod 16 becomes extremely easy. Further, the ring plate 11 is employed to easily employ various configurations for the alignment rod horizontal positioning means 20, and applicability of the alignment rod horizontal positioning means 20 for moving the alignment rod 16 in the horizontal direction can be widened.
    • 要解决的问题:提供一种桩和上部结构的接合结构,其有助于定位对准杆的操作。解决方案:桩和上部结构的接合结构采用用于桩头帽工具的环板11 10包括沿垂直方向延伸的对准杆16,因此对准杆16仅在水平方向上移动,以便通过对准杆水平定位装置20基于以水平姿势放置的环形板11进行对准。 因此,通过对准杆16的对准精度容易提高,并且使对准杆16定位的操作非常容易。 此外,环板11用于容易地采用用于对准杆水平定位装置20的各种构造,并且可以扩大用于使对准杆16沿水平方向移动的对准杆水平定位装置20的适用性。
    • 39. 发明专利
    • Method of replacing railway rail
    • 铁路铁路替代方法
    • JP2012237110A
    • 2012-12-06
    • JP2011105473
    • 2011-05-10
    • Daitetsu Kogyo Kk大鉄工業株式会社
    • KIKAWA KOSUKEFUKUI YOSHIHIRO
    • E01B29/16
    • PROBLEM TO BE SOLVED: To shorten an operation time for replacement of a rail by decreasing the raising amount of a rail.SOLUTION: A new rail Rnew is arranged outside an old rail Rold in parallel with the old rail Rold. The old rail Rold is pressed in a track from one end side of the old rail Rold and moved. The new rail Rnew is moved to a predetermined position P1 formed by the movement of the old rail Rold, and temporarily placed. The old rail Rold moved into the track is lifted from the one end side. Then the old rail Rold lifted in the track beyond the temporarily placed new rail Rnew is sent out of the new rail Rnew.
    • 要解决的问题:通过减小轨道的上升量来缩短更换轨道的操作时间。

      解决方案:一条新的铁路Rnew安排在旧铁路Rold外与老铁路Rold并列。 老铁路Rold被压在一条轨道上,从旧铁路的一端拉出并移动。 新的轨道Rnew移动到由旧轨道Rold的运动形成的预定位置P1,并暂时放置。 老铁路进入轨道的老铁路从一端抬起。 然后老铁路Rold在轨道上抬起,超出了临时放置的新铁路Rnew从新铁路Rnew发出。 版权所有(C)2013,JPO&INPIT