    • 27. 发明专利
    • MEASURING SYSTEM IN BUILDING WORK
    • JPS61280512A
    • 1986-12-11
    • JP12208785
    • 1985-06-05
    • SHIMIZU CONSTRUCTION CO LTD
    • SHIMAZAKI YASUYOSHIINOUE KAGEHIKOMITSUNE NAOTO
    • G01D9/00G01C15/00
    • PURPOSE:To enable the accurate recording of measured data, by providing a digital display part and converting a measured value to measured data of a digital value not only to display said measured data on the digital display part but also to transmit the same to a recording apparatus. CONSTITUTION:A recording apparatus 2 is equipped with a key input means, a microprocessor, a recording means or an output means such as a printer or a digital display board and receives measured data covered to a digital signal from a digital fail-safe probe 1 to edit, form and record an inspection card (measuring card) according to key input and performs print output or digital display output to send out the same to a data processor 3. The data processor 3 is connected to the recording apparatus 2 by a line and receives the data edited, formed and recorded by the recording apparatus 2 to apply statistical processing thereto while the processed data is arranged in an office as a central control data. In this case, because measured data is obtained by a measuring machine without performing manual reading work, the enhancement of inspection accuracy and the prevention of an erroneous work can be achieved.
    • 29. 发明专利
    • METHOD FOR DEMOLISHING IRON TOWER SUPPORTING STEEL CHIMNEY
    • JP2003184346A
    • 2003-07-03
    • JP2001382207
    • 2001-12-14
    • SHIMIZU CONSTRUCTION CO LTD
    • SHIMAZAKI YASUYOSHIMOTOI SHINICHISENKAI MASATOSHIMURAKAMI KAZUO
    • E04H12/28E04G23/08
    • PROBLEM TO BE SOLVED: To demolish and remove an iron tower supporting steel chimney without using a large crane. SOLUTION: There is provided a method for demolishing the iron tower supporting steel chimney, according to which a lower portion of a chimney main body 1 is demolished and removed by a predetermined length, and it is jacked down depending on the support and guide of an iron tower 2, whereby the chimney main body assumes a fixed and self-supported position. Then, a lower portion of the iron tower is demolished and removed by a predetermined length, and it is jacked down depending on the support and guide of the chimney main body which is self-supported after the partial demolition in the preceding step, whereby the iron tower assumes a fixed and self-supported position. Further, the lower portion of the chimney main body after the partial demolition is demolished and removed by a predetermined length, and it is jacked down depending on the support and guide of the iron tower which is self-supported after the partial demolition in the preceding step, followed by demolishing and removing a finally left portion of the iron tower. According to the method, a base portion of the chimney main body is left without demolition and removal, and the lower end of the chimney main body after the partial demolition is rigidly connected to the base portion, to thereby maintain the self-support of the chimney main body. Further, a temporary fixing member to which the lower end of the iron tower after the partial demolition can be rigidly connected, is set in a horizontally changeable and vertically rotatable manner. COPYRIGHT: (C)2003,JPO