    • 23. 发明专利
    • Removable spacer and concrete form method
    • 可拆卸间距和混凝土形式方法
    • JP2014055400A
    • 2014-03-27
    • JP2012199094
    • 2012-09-11
    • Kajima Corp鹿島建設株式会社
    • YASUNAGA MASAMICHI
    • E04C5/18E01D21/00E04G17/06
    • PROBLEM TO BE SOLVED: To secure a cover with a spacer formed from a steel material such as CT shape steel and further to iteratively use the spacer without finally leaving the spacer in concrete by drawing away the spacer in parallel with installation of concrete.SOLUTION: A removable spacer is formed from a vertical material which includes a tip sharpened part and is removable by being drawn upwards, and an upper end portion of the removable spacer can be fixed by fastening a fixing jig installed in an upper end of a form. The removable spacer is inserted between the form and a reinforcing-bar while bringing one side thereof into contact with the form and when the removable spacer reaches predetermined depth, the upper end portion is fixed to the form by the fixing jig. After one layer of concrete is installed, the fixing jig is unfastened and the removable spacer is pulled up from concrete by a length of one layer. By repeating such operation, the spacer is removed completely.
    • 要解决的问题:为了用诸如CT型钢的钢材形成的间隔件来固定盖子,并且通过与混凝土的安装平行地拉出隔离件,并且通过抽出间隔件而不用最终将间隔件留在混凝土中,并且迭代地使用间隔件。 可拆卸间隔件由垂直材料形成,其包括尖端锐化部分并且可通过向上拉动而被移除,并且可移除间隔件的上端部分可以通过紧固安装在形式上端的固定夹具来固定。 可拆卸的间隔件插入形式和加强杆之间,同时使其一侧与形式接触,并且当可移除的间隔件达到预定深度时,上端部通过固定夹具固定成形式。 在安装一层混凝土之后,固定夹具松开,可拆卸的隔板从混凝土中拉出一层长度。 通过重复这种操作,间隔物被完全去除。
    • 25. 发明专利
    • Lifting pipe and method of constructing lifting pipe
    • 提升管和构造提升管的方法
    • JP2010106596A
    • 2010-05-13
    • JP2008280843
    • 2008-10-31
    • Kajima Corp鹿島建設株式会社
    • YASUNAGA MASAMICHIMATSUURA MASANORI
    • E02D29/045E02D5/20E21D13/00F16L59/04F16L59/14F17C13/00
    • PROBLEM TO BE SOLVED: To provide a lifting pipe and a method of constructing the lifting pipe which allow an inner pipe and a heat insulator to be installed securely and easily even if an outer pipe bends, and is low in construction cost. SOLUTION: The outer pipe 17 is constructed in a slot 27 drilled in a soil 3 at a place where a continuous underground wall 5 is scheduled to be built. Concrete 29 etc., is placed in the slot 27 to bury the outer pipe 17 in the continuous underground wall 5. Subsequently, while the outer pipe 17 and a drain pipe 9 disposed below the outer pipe 17 are used as a temporary drainage facility, a bottom plate 13, a side wall 15, etc. are constructed inside the continuous underground wall 5. While a space 35 is secured between the outer pipe 17 and an inner pipe 19 with a plurality of spacers 33 fixed on the inner pipe 19, the inner pipe 19 is inserted in the outer pipe 17, and a lower lid 25 is fixed to close the lower end of the space 35. After that, the space 35 between the outer pipe 17 and the inner pipe 19 is filled with a powdered or fluidic insulator 21, and an upper lid 23 is fixed to close the upper end of the space 35. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种提升管和一种构造提升管的方法,其允许内管和隔热件即使外管弯曲而可靠且容易地安装,并且结构成本低。

      解决方案:外管17构造在在预定要建造连续的地下墙5的地方在土壤3中钻出的槽27中。 混凝土29等放置在槽27中以将外管17埋入连续的地下壁5中。随后,当外管17和设在下管17下方的排水管9用作临时排水设备时, 底板13,侧壁15等构成在连续的地下壁5的内部。当空间35固定在外管17和内管19之间时,多个间隔件33固定在内管19上, 内管19插入外管17中,并且固定下盖25以封闭空间35的下端。之后,外管17和内管19之间的空间35填充有粉末状 或流体绝缘体21,并且固定上盖23以闭合空间35的上端。版权所有(C)2010,JPO&INPIT

    • 26. 发明专利
    • Side wall and method of constructing the same
    • 侧壁及其构造方法
    • JP2008308864A
    • 2008-12-25
    • JP2007157014
    • 2007-06-14
    • Kajima Corp鹿島建設株式会社
    • YASUNAGA MASAMICHI
    • E02D29/045E21D13/00
    • PROBLEM TO BE SOLVED: To provide a method of constructing a side wall which is allowed to construct in a short period, in which construction joint produced when concrete is placed is not formed, and which has excellent watertightness since cracking resulting from the construction joint does not occur when the side wall of a large-scale reinforced concrete underground structure is constructed and also provide the side wall constructed by the method.
      SOLUTION: An outer reinforcement net 15b is joined to the upper part of an outer reinforcement net 15a suspended from an outer reinforcement support frame 9, and lowered by a crane 13 to suspend the outer reinforcement net 15b from the outer reinforcement support frame 9. The steps above are repeated for constructing an outer reinforcement net 15 over the entire length of an underground continuous wall 1. In the same manner, the inner reinforcement net 27 is constructed. After a form 31 is constructed, a concrete 33 is deposited at once for constructing the side wall.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种在短时间内构造的侧壁的构造方法,其中在形成混凝土时产生的施工接头没有形成,并且由于由于 当大型钢筋混凝土地下结构的侧壁构造时,不会发生施工接头,并提供通过该方法构造的侧壁。 解决方案:外部加强网15b与从外部加强支撑框架9悬挂的外部加强网15a的上部接合,并由起重机13下降,以将外部加强网15b从外部加强支撑框架 重复上述步骤以在地下连续壁1的整个长度上构造外部加强网15。以相同的方式构造内部加强网27。 在构造一个形式31之后,立刻沉积一个混凝土33以构成侧壁。 版权所有(C)2009,JPO&INPIT
    • 27. 发明专利
    • Water cut-off structure
    • 水切割结构
    • JP2008075246A
    • 2008-04-03
    • JP2006252126
    • 2006-09-19
    • Kajima Corp鹿島建設株式会社
    • YASUNAGA MASAMICHI
    • E04B1/684E02D31/02
    • PROBLEM TO BE SOLVED: To provide a water cut-off structure capable of economically and easily cutting off water at a joined part where a relative displacement is produced between members in an underground structure.
      SOLUTION: A continuous underground wall 5 is constructed, a ground 1 is excavated, and a leveling concrete 17b is deposited thereon. Next, a water barrier sheet 19 is disposed, and a space 31 is formed above the center portion 21 of the water barrier sheet 19, and a leveling concrete 17a is deposited thereon. A deformation suppressing member 27 is installed on the leveling concrete 17a. The fixing part 35 of the water barrier sheet 19 is held between the leveling concrete 17b and the concrete of a side wall 7 and a bottom board 9 by depositing the concrete of the side wall 7 and the bottom board 9 with a space 29 provided therebetween. The end 25 of the deformation suppressing member 27 is buried into and fixed to the concrete of the side wall 7 and the bottom board 9.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种能够在地下结构中的构件之间产生相对位移的接合部处经济地且容易地切断水的截水结构。

      解决方案:构造连续的地下墙5,挖出地面1,并在其上沉积流平的混凝土17b。 接下来,设置防水片19,并且在防水片19的中心部21的上方形成有空间31,并且在其上淀积调平混凝土17a。 变形抑制构件27安装在调平混凝土17a上。 通过将侧壁7和底板9的混凝土沉积在其间设置有空间29,将阻水片19的固定部分35保持在平整混凝土17b与侧壁7和底板9的混凝土之间 。 变形抑制构件27的端部25被埋入并固定到侧壁7和底板9的混凝土上。版权所有(C)2008,JPO&INPIT

    • 30. 发明专利
    • EXCAVATOR, CONSTRUCTION METHOD FOR UNDERGROUND CONTINUOUS WALL, AND JOINT STRUCTURE
    • JPH1113082A
    • 1999-01-19
    • JP17005397
    • 1997-06-26
    • KAJIMA CORP
    • YASUNAGA MASAMICHI
    • E02F5/08E02D5/20
    • PROBLEM TO BE SOLVED: To provide a structure requiring no lateral beam by constructing a panel with an excavator provided with a drum rotatable around a shaft and an excavation section having different excavation depths near the end sections of the drum and near the center, providing a recess on one of preceding panels and a succeeding panel and a projection on the other, and engaging the recess and the projection. SOLUTION: Portions of preceding panels 11a, 11b are excavated by an excavator, concrete is placed, and a reinforced cage is arranged. The portion of a succeeding panel 13 is excavated while the end sections of the preceding panels 11a, 11b are excavated into a trapezoidal shape, concrete is placed, and a reinforced cage is arranged. The end sections of the preceding panels 11a, 11b are excavated by the excavator to form a recess when the succeeding panel 13 is excavated. When concrete is placed to the portion of the succeeding panel 13, a projection can be formed on the succeeding panel 13, and a joint structure capable of transferring shearing force is formed. A structure requiring no lateral beam is obtained.