会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 23. 发明申请
    • METHOD OF DEPLOYING AND POWERING AN ELECTRICALLY DRIVEN DEVICE IN A WELL
    • 在井中部署和驱动电驱动装置的方法
    • WO2005003506A2
    • 2005-01-13
    • PCT/GB2004/002941
    • 2004-07-05
    • HEAD, Philip
    • HEAD, Philip
    • E21B17/02
    • E21B23/02E21B17/026E21B17/028E21B43/128
    • A system for installing a powered device in a downhole tube, comprising a power line disposed along a production tube which terminates in a first power connector, an orientation means disposed in the vicinity of the first power connector, and a powered device including a second power connector. The powered device is lowered down the production tube and oriented by the orientation means so that the first power connector means and second power connector means engage to connect the powered device to the power line. In another embodiment, the system comprises a power line disposed along a production tube, terminating in a first power connector, and a powered device including a second power connector, one or both of the connectors being radially displaced as the powered tool is lowered such that the connectors are aligned for engagement. Also shown in a method where an electrical power cable is connected to a first part of a wet mateable electrical power connector which is secured to a lower region of a production tubing; lowering the production tubing and the electrical power cable into the well; lowering through the production tubing an electrically driven downhole fluid transducer system which is equipped with a second part of a wet mateable electrical power connector; releasably latching the transducer system to the production tubing such that the two parts of the wet mateable power connector face each other, and lowering the electrical submersible fluid transducer system.
    • 一种用于将动力装置安装在井下管中的系统,包括沿着生产管设置的电力线,所述生产管终止于第一电力连接器,设置在所述第一电力连接器附近的定向装置, 以及包括第二电源连接器的受电设备。 受电设备在生产管下降并且由定向装置定向,使得第一电力连接器装置和第二电力连接器装置接合以将受电设备连接到电力线。 在另一个实施例中,该系统包括沿生产管布置的电力线,终止于第一电力连接器以及包括第二电力连接器的受电设备,当动力工具下降时,连接器中的一个或两个径向移位,使得 连接器对齐以便啮合。 还示出了一种方法,其中电力电缆连接到固定到生产管的下部区域的湿配合电力连接器的第一部分; 将生产油管和电力电缆放入井中; 通过生产管下降电动驱动的井下流体传感器系统,该电动驱动的井下流体传感器系统配备有湿式可配合电力连接器的第二部分; 将换能器系统可释放地锁定到生产管道,使得湿配合电力连接器的两部分彼此面对,并且使电潜水流体换能器系统下降。
    • 24. 发明申请
    • WELL TREATMENT SYSTEM
    • 井处理系统
    • WO2004065758A1
    • 2004-08-05
    • PCT/GB2004/000290
    • 2004-01-23
    • HEAD, Philip
    • HEAD, Philip
    • E21B33/127
    • E21B33/1243E21B33/1275E21B33/134
    • A method of sealing at least part of a well at a position remote from the surface, comprises providing a settable sealing material (13, 14) in a well having a casing (22) or wall. The settable material is contained in a discharge chamber and is dischargeable from the chamber by a discharge means (11) to set in the form a seal at the required position. The settable material is discharged from a cylindrical discharge chamber lowered into the well, and a piston urges the settable sealing material into an expandable sealing chamber to form the seal.
    • 一种在远离表面的位置处密封井的至少一部分的方法,包括在具有壳体(22)或壁的井中提供可固化的密封材料(13,14)。 可设置材料容纳在排出室中,并且可通过排出装置(11)从室排出,以将密封件设置在所需位置。 可固化材料从下降到井中的圆柱形排出室排出,活塞将可固化密封材料推动到可膨胀密封室中以形成密封。
    • 30. 发明申请
    • A METHOD OF ABANDONING A WELL
    • 一个失败的方法
    • WO2005042918A1
    • 2005-05-12
    • PCT/GB2004/004476
    • 2004-10-22
    • HEAD, Philip
    • HEAD, Philip
    • E21B33/13
    • E21B33/13
    • A method of abandoning a well, said well comprising at least two concentric conduits (28,30) defining a main bore and at least one annular chamber (40) there between, comprising the steps of providing a perforation in one or more of the conduits, pumpi.ng out the fluiti from the annular chamber and/or main bore to create a fluiti-free void, inserting sealing material in the annular chamber and/or main bore to seal it/them. There is also provided an apparatus for abandoning a well having at least two concentric conduits defining at least one annular chamber there between, the apparatus including a pump (50) and a perforation forming device (42).
    • 一种放弃井的方法,所述井包括限定主孔的至少两个同心管道(28,30)和其间的至少一个环形室(40),包括在一个或多个管道中提供穿孔的步骤 ,从环形室和/或主孔中泵出流体,以产生无流体的空隙,将密封材料插入环形室和/或主孔中以将其密封。 还提供了一种用于放弃具有至少两个同心管道的井的设备,所述至少两个同心管道在其间限定至少一个环形室,所述设备包括泵(50)和穿孔形成装置(42)。