    • 16. 发明专利
    • POWER CONSUMPTION CONTROLLER
    • JPH05211720A
    • 1993-08-20
    • JP1636692
    • 1992-01-31
    • KUMAGAI GUMI CO LTD
    • ABE SHIGEKIKIDO YOSHIKAZU
    • H02J3/00
    • PURPOSE:To suppress the total consumption within a contract demand by ranking a plurality of power-consuming devices according to importance and by controlling the total consumption so that it does not exceed an allowable electric energy. CONSTITUTION:When there are e.g. three power-consuming devices A (shield machine 11), B (muddy water transport apparatus 12), and C (muddy water treatment apparatus 13) at a site of construction and the importance of the device A is the highest and that of the device C is the lowest, the total of consumption is compared with a preset allowable electric energy; and when the total consumption is going to exceed the allowable electric energy, the electric power of the device C of the lowest importance is limited or the consumption of the power is stopped first. Thus, when the total consumption exceeds the allowable electric energy, the consumption of power is successively limited or stopped from the power-consuming device ranking low in the importance upward so that the total consumption is controlled to below the allowable electric energy.
    • 19. 发明专利
    • SEGMENT FOR LINING
    • JPH0270895A
    • 1990-03-09
    • JP21858388
    • 1988-09-02
    • KUMAGAI GUMI CO LTD
    • KIDO YOSHIKAZUKITAHARA YOICHIKAWAMURA YOSHIYUKI
    • E21D11/08
    • PURPOSE:To obtain segments proper to the formation of curve sections by angling at least one second surface sections of the axial side faces of each segment specifying the other side section of a ring with cross sections. CONSTITUTION:At least one of two second surface sections continuing to first surface sections are set so as to be angled with cross sections in each of both axial side faces of respective segment T specifying both side sections of a ring 18. Second surface sections 44b, 44c continuing to the first surface sections 44a of the axial side faces on the left sides of each segment T respectively face one another to the second surface sections 42b, 42c of the axial side faces, and both second surface sections 44b, 42b are set so that distances to a surface parallel with a cross section between these surface sections are all decreased gradually and increased gradually, and both second surfaces 44c, 42c are also set so that distances to a surface parallel with a cross section between these surface sections are all reduced gradually and augmented gradually. Accordingly, a curve section having a steep curve can easily be constructed.
    • 20. 发明专利
    • Concrete placing method for tunnel construction, and form piece of inner form
    • 隧道施工的混凝土配置方法和内部形式的形式
    • JP2009243064A
    • 2009-10-22
    • JP2008088415
    • 2008-03-28
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • SENDAI KEIZOKAWAGOE MASARUKIDO YOSHIKAZUMORISAKI YASUTAKATANAKA SHINJIKIMURA AKIRAMARUI RYOKICHI
    • E21D11/10E21D9/06
    • PROBLEM TO BE SOLVED: To prevent the occurrence of discoloration of concrete in a position near a form surface of an end form, corresponding to an intermediate position between concrete placing holes adjacent to each other in the circumferential direction of the ring of the end form.
      SOLUTION: In this concrete placing method for the tunnel construction, the concrete is placed in a lining section forming space 100 which is enclosed with a form surface 34 of an inner form 30A, the form surface 7a of the end form 7 and an inner peripheral surface of a tunnel cavity section, via the concrete placing hole 9 which is provided in the end form 7. A concrete flow control body (rod body 51) is provided in a position, facing the concrete placing hole 9, of the lining section forming space 100. Thus, the concrete placed in the lining section forming space 100 via the concrete placing hole 9 flows in a direction along the inner peripheral surface of the tunnel cavity section by the concrete flow control body.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:为了防止混凝土在靠近端部形状的表面的位置发生变化,对应于在环形的圆周方向上彼此相邻的混凝土浇筑孔之间的中间位置 最终形式。 解决方案:在隧道施工的这种混凝土浇筑方法中,将混凝土放置在内部段形成空间100中,内部段形成空间100被内部形式30A的形式表面34,端部形式7的形状表面7a和 通过设置在端部形式7的混凝土浇注孔9,形成隧道腔部的内周面。混凝土流动控制体(杆体51)设置在与混凝土浇注孔9相对的位置 因此,通过混凝土浇注孔9配置在衬套部形成空间100中的混凝土沿着隧道型腔部的内周面的方向通过混凝土流动控制体流动。 版权所有(C)2010,JPO&INPIT