    • Construction of power generation plant
    • 发电厂建设
    • JPS58218507A
    • 1983-12-19
    • JP10064682
    • 1982-06-14
    • Hitachi Eng Co LtdHitachi Ltd
    • IWATA NOBUKATSUKODAMA TOYOICHIOCHIAI KANEHIROSHINNO TAKESHI
    • E02D27/32E02B9/00
    • E02B9/00Y02E10/22
    • PURPOSE:To obtain functions as a landing place and a tailrace by permitting the start-up of construction work of a plant house in early period by utilizing a water-proof weir as a quaywall for a power plant site readjustment plan. CONSTITUTION:A water-proof weir 7 is constructed on the land inside and outside of a site, and then transported to the position of a quaywall by a floating transport method for setting. The water-proof weir 7 to be constructed in a straight line to the quaywall position is of a form unloadable from a barge at the time of construction. Also, in the water-proof weir 7, a tailrace 4 provided between the quaywall and a power generation plant 1 is passed. By utilizing the straightness of the quaywall, a gantry crane acrossing the whole units is set and used as a common landing facility. The water-proof weir 7 can serve as a cut-off weir permitting the early-period start-up of construction of a plant house and also as a unloading quaywall from a barge, and can also be utilized a trench having a function as a seawater tailrace for circulating water, etc.
    • 目的:通过采用防水堰作为发电厂现场调整方案的三角井,通过允许早期启动厂房建设工作,获得作为着陆点和尾迹的功能。 构成:在场地外的地面上建造防水堰7,然后通过浮动运输方式运输到码头的位置。 要建造在直立到码头墙位置的防水堰7是在施工时从驳船卸载的形式。 此外,在防水堰7中,通过在quaywall和发电厂1之间设置的尾料4。 通过利用立体墙的平直度,将整个单元的龙门起重机设置为常用的着陆设施。 防水堰7可以作为一种截止堰,允许早期建造一座植物房屋,也可以作为一艘驳船的卸货码垛,并且还可以利用一个具有作用的沟槽 海水尾水循环水等