会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 12. 发明专利
    • Geological exploration device
    • 地质勘探装置
    • JP2013057176A
    • 2013-03-28
    • JP2011194730
    • 2011-09-07
    • Shimizu Corp清水建設株式会社Oyo Corp応用地質株式会社
    • KANEMARU KIYOTOKONO SHIGEYUKIFURUTO YUKIHIROSUGIYAMA HIROKAZUSAKURAI TAKESHISAITO HIDEKISUGAWARA TOSHIOTAGO KOICHI
    • E21D9/06E21D9/04E21D13/04G01V3/02
    • PROBLEM TO BE SOLVED: To provide an effective and appropriate geological exploration device capable of exploring geology of natural ground over a wide range when excavating a tunnel or the like.SOLUTION: The geological exploration device comprises: a rotary cutter (rotating body) 3 to be inserted into natural ground; a specific resistance sensor 5 composed of electrodes 7 (current electrodes 7a and 7b and voltage electrodes 7c and 7d); an energizing device for making a current flow to the current electrodes 7a and 7b; and an arithmetic unit for measuring a voltage of the voltage electrodes 7c and 7d and the current of the current electrodes 7a and 7b and computing specific resistance. The specific resistance sensor is attached to an outer peripheral part of the rotary cutter (rotating body) 3, the specific resistance of the natural ground is measured by the specific resistance sensor 5 by the rotation of the rotary cutter (rotating body) 3 inserted into the natural ground, and the geology of the natural ground on the outer periphery of the rotary cutter (rotating body) 3 is explored over the entire periphery. A tunnel excavator 1 is made to be a base machine, the rotary cutter (rotating body) 3 on the front surface is utilized as the rotating body for rotating the specific resistance sensor, and the specific resistance sensor is attached to an outer peripheral end face of the rotary cutter (rotating body) 3.
    • 要解决的问题:提供一种能够在挖掘隧道等时,在广泛范围内探索自然地质地质的有效和适当的地质勘探装置。 解决方案:地质勘查装置包括:旋转切割器(旋转体)3,插入自然地面; 由电极7(电流电极7a,7b,电压电极7c,7d)构成的电阻率传感器5。 用于使电流流向电流电极7a和7b的通电装置; 以及用于测量电压电极7c和7d的电压以及电流电极7a和7b的电流并计算电阻率的运算单元。 电阻式传感器安装在旋转刀具(旋转体)3的外周部,通过旋转刀具(旋转体)3的旋转,由比电阻传感器5测量自然地的电阻率 在旋转刀具(旋转体)3的外周上的自然地面和自然地质的地质学在整个周边被探索。 将隧道式挖掘机1作为基础机械,将前表面的旋转刀具(旋转体)3用作旋转电阻传感器的旋转体,将电阻率传感器安装在外周端面 旋转刀具(旋转体)3。版权所有(C)2013,JPO&INPIT
    • 13. 发明专利
    • Construction method of heavy-section tunnel
    • 重型隧道施工方法
    • JP2014043738A
    • 2014-03-13
    • JP2012187748
    • 2012-08-28
    • Shimizu Corp清水建設株式会社
    • KANEMARU KIYOTOKONO SHIGEYUKIASO TOSHIMITSU
    • E21D9/04E21D9/06E21D13/02
    • PROBLEM TO BE SOLVED: To prevent a construction period from being prolonged or cost from being increased, by reducing an underground occupant area of a starting portion of an outer shell shield tunnel which is constructed outside of a main-track shield tunnel in construction of an underground cavity part.SOLUTION: According to a construction method of a heavy-section tunnel, a main-track shield tunnel 1 is constructed, a circumferential shield starting base 3 is constructed by enlarging a portion of the main-track shield tunnel 1, and a ring-shaped outer shell shield starting base 4 is constructed by performing circumferential excavation from the circumferential shield starting base 3 along an outer circumferential surface 1a of the main-track shield tunnel 1 by means of a circumferential shield machine. A plurality of outer shell shield tunnels 2 are constructed by starting an outer shell shield machine 6 from a sidewall part 41B of the outer shell shield starting base 4, and the outer shield tunnel 2 is started from the outer shell shield starting base 4 in parallel with the main-track shield tunnel 1 and directed away from the main-track shield tunnel 1 to the radial outside gradually with progress of excavation.
    • 要解决的问题:为了防止施工期延长或成本增加,通过减少构造在主轨道屏蔽隧道外部的外壳屏蔽隧道的起始部分的地下乘员区域, 地下洞室部分。解决方案:根据重型隧道的施工方法,构成主轨道屏蔽隧道1,通过扩大主轨道屏蔽隧道1的一部分构造周边盾构起始基座3, 环状的外壳防护罩起动底座4通过周围的防护罩机构沿着主轨道屏蔽通道1的外周面1a从周面罩起动基座3进行周向的挖掘而构成。 多个外壳屏蔽隧道2是通过从外壳屏蔽启动基座4的侧壁部分41B启动外壳屏蔽机构6构成的,并且外屏蔽通道2从外壳屏蔽启动基座4并联起动 与主轨道护盾隧道1一起,随着挖掘的进行逐渐远离主轨道护盾隧道1到径向外侧。
    • 14. 发明专利
    • Cantilever beam structure
    • 坎蒂波束结构
    • JP2013159949A
    • 2013-08-19
    • JP2012022246
    • 2012-02-03
    • Shimizu Corp清水建設株式会社Mitsui Kagaku Sanshi Kk三井化学産資株式会社
    • TAKANASHI KAZUMITSUOSAKI YUSAKUKONO SHIGEYUKIIDE KAZUNAOSHIMIZU MIKIOONO TOMONORIFUJIKAKE KAZUNORIASO TOSHIMITSU
    • E04F13/02
    • PROBLEM TO BE SOLVED: To maintain a shape of a skeleton, and to prevent dissipation of concrete pieces generated from a broken skeleton.SOLUTION: A pier 1 is provided which has a configuration where a concrete skeleton 2 is provided in which a quay wall 21 and a pier body 22 having a free end projecting from the quay wall 21 are integrally joined, the surface of the skeleton 2 is coated with a resin reinforcing film 3, the reinforcing film 3 is made of a compound formed by chemical reaction between an isocyanate and a curing agent consisting of at least one of a polyol and an amine, and the reinforcing film 3 is provided on the upper surface 22a and lower surface 22b of the pier body 22 in the skeleton 2 receiving an impact force and on the side surface of a corner part forming a joining part T of the pier body 22 and the quay wall 21.
    • 要解决的问题:为了保持骨架的形状,并且防止由破碎的骨架产生的混凝土片的散发。解决方案:提供一种墩1,其具有设置有混凝土骨架2的构造,其中,码头壁21 并且具有从码头壁21突出的自由端的墩身22一体地接合,骨架2的表面涂覆有树脂增强膜3,增强膜3由通过异氰酸酯之间的化学反应形成的化合物 和由多元醇和胺中的至少一种组成的固化剂,并且在承受冲击力的骨架2中的墩身22的上表面22a和下表面22b上设置增强膜3,在侧面 形成墩体22和码头壁21的接合部T的角部。
    • 15. 发明专利
    • Liquid stopping bank, and structure
    • 液体停止库存和结构
    • JP2013159361A
    • 2013-08-19
    • JP2012022243
    • 2012-02-03
    • Shimizu Corp清水建設株式会社Mitsui Kagaku Sanshi Kk三井化学産資株式会社
    • TAKANASHI KAZUMITSUOSAKI YUSAKUKONO SHIGEYUKIIDE KAZUNAOSHIMIZU MIKIOONO TOMONORIFUJIKAKE KAZUNORIASO TOSHIMITSU
    • B65D90/24E02D31/00
    • PROBLEM TO BE SOLVED: To provide a liquid stopping bank which prevents concrete pieces of the body from scattering even if the body of the liquid stopping bank is destroyed by earthquake or Tsunami or the like, keeps the standing shape without falling down or collapsing, and in addition, keeps functions of the liquid stopping bank to prevent the flowing out of the content having leaked out from a tank even when joint sections have been damaged, and also, is easily constructed at a low cost.SOLUTION: A liquid stopping bank 1 is installed around a tank T, and on its body 2 made of concrete, joint sections are formed. On the surface of the body 2, a reinforcing film 3 made of a resin consisting of a compound formed by a chemical reaction of an isocyanate and a hardening agent consisting of at least one of a polyol and an amine is applied. The reinforcing film 3 is applied at least across the joint sections and covers the joint sections.
    • 要解决的问题:为了提供防止液体停止堤的体积被地震或海啸等破坏的体内的混凝土块的液体停止堤,保持站立形状而不会掉落或塌陷,并且 此外,即使在接头部分损坏时也保持液体停止堤的功能,以防止从罐中泄漏出的内容物流出,并且也容易以低成本构造。解决方案:液体停止池1 安装在罐T周围,并在其由混凝土制成的主体2上形成接合部。 在本体2的表面上,涂布由由异氰酸酯化学反应形成的化合物和由多元醇和胺中的至少一种构成的硬化剂构成的树脂构成的增强膜3。 加强膜3至少施加在接合部上并覆盖接合部。
    • 17. 发明专利
    • Tunnel construction method
    • 隧道施工方法
    • JP2008308907A
    • 2008-12-25
    • JP2007158708
    • 2007-06-15
    • Shimizu Corp清水建設株式会社
    • KONO SHIGEYUKIUEHARA YOSHIFUMIASO TOSHIMITSU
    • E21D9/06E21D9/04
    • PROBLEM TO BE SOLVED: To provide a tunnel construction method in which use of a main line tunnel is started in an early stage, and a ramp tunnel and a junction are constructed while using the main line tunnel.
      SOLUTION: According to the tunnel construction method, the main line tunnel 1 is excavated prior to the ramp tunnel 2, and a roof shield machine 5 is started from the main line tunnel to construct shield roof preliminary work 3 outside a construction scheduled area of the bifurcation junction 4, followed by excavating inside the preliminary work, to thereby construct the junction. After starting of the common use of the main line tunnel, the ramp tunnel is connected to the bifurcation junction. Alternatively, after the preceding construction of the main line tunnel and the starting of the common use of the same, the ramp tunnel is extended to the construction scheduled area of the bifurcation junction, and then the roof shield machine is started from the construction scheduled location to construct the shield roof preliminary work, followed by excavating inside the preliminary work, to thereby construct the bifurcation junction.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种隧道施工方法,其中使用主线隧道在早期开始,并且在使用主线隧道的同时构建斜坡隧道和接合点。

      解决方案:根据隧道施工方法,在斜坡隧道2之前挖掘主线隧道1,并从主线隧道开始屋顶盾构机5,以在施工安排外构建防护屋顶预备工作3 分岔路口4的区域,然后在前期工作中进行挖掘,从而构建交界处。 在主线隧道通常使用开始之后,斜坡隧道连接到分岔路口。 或者,在主线隧道的上述构造和其共同使用的开始之后,斜坡隧道延伸到分叉交叉点的施工预定区域,然后从施工安排位置启动屋顶护盾机 构建盾构屋顶预备工作,然后在初步工作中进行挖掘,从而构建分岔路口。 版权所有(C)2009,JPO&INPIT