    • 11. 发明专利
    • Reinforcing structure and reinforcing method for ground
    • 加固结构和加固方法
    • JP2007040029A
    • 2007-02-15
    • JP2005227177
    • 2005-08-04
    • Ohbayashi Corp株式会社大林組
    • YAMAMOTO AKIRAHAMAI KUNIHIKOMORITA KOJIINAGAWA TAKENOBU
    • E21D9/04
    • PROBLEM TO BE SOLVED: To provide a reinforcing structure and a reinforcing method for the ground for preventing abnormality such as loosening, deformation, and collapse of the ground due to excavation of a tunnel.
      SOLUTION: Tension members 5 buried into tunnel excavation planned sections 2 obliquely or vertically from the surface of the ground, respectively, fixing bodies 7 provided so as to surround the outer peripheries of the tension members 5 in lower parts of the tension members 5, extension members 9 connected with lower ends of the tension members 5, compression members 11 buried into sides of the tunnel excavation planned sections 2 obliquely from the surface of the ground, respectively, and pressure receiving plates 13 connected with upper end parts of the tension members and provided so as to come into contact with the surface of the ground are provided in the ground 3 around the tunnel excavation planned section 2.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种用于防止因隧道开挖引起的地面的松动,变形和塌陷等异常的地面的加强结构和加强方法。 解决方案:分别从地面倾斜或垂直埋入隧道挖掘计划段2的张紧构件5,固定体7设置成围绕张紧构件5的下部的张紧构件5的外周 5,与张力构件5的下端连接的延伸构件9,分别从地面倾斜地埋在隧道挖掘规划区域2的侧面的压缩构件11以及与地面的上端部分连接的压力接收板13 在隧道挖掘计划第2部分周围的地面3中设置有紧张构件并提供以与地面接触的位置。(C)2007年,JPO和INPIT
    • 13. 发明专利
    • Method and system for composting wood, and slope greening method and system using the same
    • 用于组合木材的方法和系统,以及使用其的坡度绿化方法和系统
    • JP2014019636A
    • 2014-02-03
    • JP2012163148
    • 2012-07-23
    • Ohbayashi Corp株式会社大林組
    • SUGIMOTO HIDEOYAMADA HIROSHIHAMAI KUNIHIKOMORITA KOJI
    • C05F17/00A01G1/00B09B3/00C05F11/00E02D17/20
    • Y02W30/43Y02W30/78
    • PROBLEM TO BE SOLVED: To compost disaster-stricken trees at site and directly reuse the compost as a vegetation base material.SOLUTION: In the slope greening method, trees that fell and slipped down due to failure of a slope 32 are used as a raw material, the raw material is crushed into a chip state by a crusher 2 to produce primary crushed chips 3, loosening treatment is performed to the primary crushed chips by a treatment apparatus 4, bacterial cells which cause microbial decomposition in treated chips 5, which were obtained immediately after the loosening treatment ended, and a nutrient material for the cells are added to the treated chips to make composting chips 6, and the composting chips are mounted and cured in a composting yard 7 to produce compost. And then, the compost is stirred and mixed by a spray machine 33 together with other vegetation base materials such as plant seeds, water, and adhesive to produce vegetation base material slurry, the vegetation base material slurry is forcibly fed to the vicinity of the slope 32 via a spray hose 34, and the slurry is then sprayed on the slope 32 via a spray nozzle 35 attached to the tip of the spray hose 34, by which vegetation foundations 36 are formed on the slope in a laminated manner.
    • 要解决的问题:对现场的灾难性树木进行堆肥,直接重复使用堆肥作为植被基础材料。解决方案:在坡耕绿化方法中,由于坡坡32的失效而跌倒和滑落的树木被用作原料 将原材料通过破碎机2粉碎成片状,制成初级碎片3,通过处理装置4对处理过的碎片5造成微生物分解的细菌细胞进行松动处理, 在松动处理结束后立即获得,并且将经过处理的芯片中的细胞营养物质加入到堆肥碎片6中,堆肥碎片在堆肥场院7中安装和固化,以生产堆肥。 然后,通过喷雾机33与植物种子,水和粘合剂等其他植被基材一起搅拌和混合堆肥,以产生植被基料浆料,将植被基料浆料强制地进料到斜坡附近 32,然后通过附接到喷雾软管34的尖端的喷嘴35将浆料喷洒在斜面32上,通过该喷嘴35,以层叠的方式在斜面上形成植被基础36。
    • 14. 发明专利
    • Reinforcing structure and reinforcing method for ground
    • 加固结构和加固方法
    • JP2007040028A
    • 2007-02-15
    • JP2005227176
    • 2005-08-04
    • Ohbayashi Corp株式会社大林組
    • YAMAMOTO AKIRAHAMAI KUNIHIKOMORITA KOJIINAGAWA TAKENOBU
    • E02D3/12E21D9/04
    • PROBLEM TO BE SOLVED: To provide a reinforcing structure and a reinforcing method for the ground for preventing abnormality such as loosening, deformation, and collapse of the ground due to excavation of a tunnel.
      SOLUTION: Tension members 5 buried into tunnel excavation planned sections 2 obliquely or vertically from the surface of the ground, respectively, fixing bodies 7 provided so as to surround the outer peripheries of the tension members 5 in lower parts of the tension members 5, extension members 9 connected with lower ends of the tension members 5, compression members 11 buried into sides of the tunnel excavation planned sections 2 obliquely from the surface of the ground, respectively, and pressure receiving plates 13 connecting the tension members 5 with the compression members 11 and provided so as to come into contact with the surface of the ground are provided in the ground 3 around the tunnel excavation planned sections 2.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种用于防止因隧道开挖引起的地面的松动,变形和塌陷等异常的地面的加强结构和加强方法。 解决方案:分别从地面倾斜或垂直埋入隧道挖掘计划段2的张紧构件5,固定体7设置成围绕张紧构件5的下部的张紧构件5的外周 5,与张力构件5的下端连接的延伸构件9,分别从地面倾斜地埋在隧道挖掘规划区域2的侧面的压缩构件11以及将张紧构件5与 在隧道挖掘计划段2周围的地面3中设置压缩构件11并设置成与地面接触。版权所有(C)2007,JPO&INPIT
    • 15. 发明专利
    • Water retaining agent for greening, method for producing the same, and greening method using the same
    • 用于绿化的保水剂,用于生产它的方法和使用它的绿色方法
    • JP2005034076A
    • 2005-02-10
    • JP2003275752
    • 2003-07-17
    • Ohbayashi Corp株式会社大林組
    • SUGIMOTO HIDEOMORITA KOJI
    • A01G1/00A01G7/00C09K17/08C09K17/20C09K17/40C09K101/00E02B3/12E02D17/20
    • PROBLEM TO BE SOLVED: To obtain a water retaining agent for greening enabling satisfying both high water retaining quantity and high water retainability, to provide a method for producing the water retaining agent and to provide a greening method using the retaining agent.
      SOLUTION: The water retaining agent 1 for greening is obtained by coating with bentonite 3 a water retaining agent 2 such as a polymer water retaining agent with low water absorption magnifying power as illustrated in the figure (a). In more details, the water retaining agent 1 is composed of a bentonite suspension 4 and the water retaining agent 2 coated with the bentonite 3 in the bentonite suspension 4 as illustrated in the figure (b). The bentonite suspension is obtained by suspending bentonite in water, and also can be bentonite muddy water produced by a muddy water method such as underground continuous wall making technique. When using the bentonite muddy water as the bentonite suspension, for instance, it is desirable that the water retaining agent is made from a water retaining material having alkaline resistance and humidity-absorbing and releasing properties and containing an alkaline component having calcium ion as the main body.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题为了获得能够同时保持高保水量和高保水性的绿色保水剂,提供一种制备保水剂的方法,并提供使用该保留剂的绿化方法。 解决方案:如图(a)所示,通过用膨润土3将具有低吸水放大倍率的聚合物保水剂等保水剂2涂布,得到绿色保水剂1。 更详细地说,如图(b)所示,保水剂1由膨润土悬浮液4和在膨润土4中被膨润土3涂覆的保水剂2构成。 膨润土悬浮液是通过将膨润土悬浮在水中获得的,也可以是通过地下连续制墙技术的泥浆水法生产的膨润土泥浆。 例如,当使用膨润土泥水作为膨润土悬浮液时,最好保水剂由具有耐碱性和吸湿性的保水材料制成,并含有以钙离子为主要成分的碱性成分 身体。 版权所有(C)2005,JPO&NCIPI
    • 17. 发明专利
    • Boring apparatus for sloped surface
    • 陡峭的表面装置
    • JP2004132116A
    • 2004-04-30
    • JP2002299902
    • 2002-10-15
    • Fuso Kogyo:KkOhbayashi CorpOsaka Bosui Constr Co Ltd株式会社大林組株式会社大阪防水建設社株式会社扶桑工業
    • IKEDA MASAOHAMAI KUNIHIKOMORITA KOJIOMIYA SHOHEIOSADA NORIOAOKI KATSUTOSHI
    • E21B7/02E21B7/04
    • PROBLEM TO BE SOLVED: To provide a boring apparatus for a sloped surface capable of being easily set at a specified bored position without requiring much time and labor even on a wide sloped surface and rapidly, easily, and safely performing boring by laterally laying down rails on the sloped surface beforehand and moving the boring apparatus along the rails.
      SOLUTION: The rails are laterally laid down on the sloped surface beforehand, and a flat vehicle running along the rails is installed on the rails so as to be run and stopped, and a guide frame is installed on the flat vehicle so as to be derricked vertically and swung laterally. A guide cell is slidably installed on the guide frame, and a boring machine connected to a boring rod is installed on the guide cell so as to be moved forward and backward. Also, an outrigger positioned on the upper side of the sloped surface and an outrigger positioned on the lower side of the sloped surface are installed on the frame or the flat vehicle so as to be retracted. The boring machine is moved along the rails for each bored point and bores the sloped surface.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:为了提供一种能够容易地设定在指定钻孔位置的倾斜表面的钻孔装置,即使在宽的倾斜表面上也不需要太多时间和劳动,并且通过横向快速,容易且安全地执行钻孔 预先在倾斜表面上放置轨道,并沿着轨道移动钻孔装置。

      解决方案:导轨预先横向放置在倾斜表面上,沿导轨运行的平面车辆安装在轨道上以便运行和停止,并将导向架安装在平面车辆上,以便 垂直晃动并横向摇摆。 引导单元可滑动地安装在引导框架上,并且连接到镗杆的镗孔机被安装在引导单元上以便向前和向后移动。 此外,定位在倾斜表面的上侧的外伸支架和位于倾斜表面的下侧上的外伸支架安装在框架或平坦车辆上以便缩回。 钻孔机沿着每个钻孔的轨道移动并钻出倾斜的表面。 版权所有(C)2004,JPO