会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 11. 发明授权
    • 철근 유도고정 장비를 이용한 연속철근 콘크리트 포장 공법
    • 使用加固诱导/固定设备的连续增强混凝土构件的施工方法
    • KR101245828B1
    • 2013-03-20
    • KR1020120113529
    • 2012-10-12
    • (주)삼우아이엠씨
    • 김기헌배종오길용수전범준양정식원문철최판길
    • E01C7/14E01C11/18
    • E01C11/20E01C7/14E01C9/001E01C11/16E01C11/18E01C23/04
    • PURPOSE: A continuously reinforced concrete pavement method using reinforcing bar guiding/fixing equipment is provided to automatically arrange longitudinal reinforcing bars on regular positions without lateral auxiliary reinforcing bars, thereby minimizing the amount of reinforcing bars and workloads and improving the construction speed. CONSTITUTION: A continuously reinforced concrete pavement method using reinforcing bar guiding/fixing equipment(100) includes: a step of driving and moving the reinforcing bar guiding/fixing equipment with guide tubes and reinforcing bar holding devices in order to longitudinally arrange the reinforcing bars on regular positions; a step of placing concrete on the upper side of the arranged reinforcing bars; and a step of finishing the placed concrete to be flattened with a paver(300). [Reference numerals] (AA) Driving direction
    • 目的:使用钢筋导向/固定设备的连续钢筋混凝土路面方法,将纵向钢筋自动布置在常规位置上,无需侧向辅助钢筋,从而最大限度地减少钢筋数量和工作量,提高施工速度。 构成:使用钢筋引导/固定设备(100)的连续钢筋混凝土路面方法包括:用引导管和钢筋保持装置驱动和移动钢筋导向/固定设备的步骤,以便将钢筋纵向布置在 常规职位 将混凝土放置在布置的钢筋的上侧的步骤; 并且用摊铺机(300)整理待铺设的混凝土的步骤。 (标号)(AA)行驶方向