会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 121. 发明申请
    • MANAGING A SUSTAINABLE CLOUD COMPUTING SERVICE
    • 管理可持续云计算服务
    • US20130290511A1
    • 2013-10-31
    • US13458044
    • 2012-04-27
    • Susan Chuzhi TuCullen E. BashYuan ChenDaniel Juergen GmachDejan S. Milojicic
    • Susan Chuzhi TuCullen E. BashYuan ChenDaniel Juergen GmachDejan S. Milojicic
    • G06F15/173
    • G06F9/5072
    • A method for managing a cloud using a cloud controller and a sustainability metrics manager having executable computer-readable instructions stored on a database first includes receiving a request from a cloud user to implement a new cloud service having at least one service characteristic. Once the request is received, the controller computes a prediction of a first sustainability impact based on the service characteristic for an implementation of the cloud service on a high quality of service (QoS) server operating in the cloud, and also computes a prediction of a second sustainability impact based on the service characteristic for an implementation of the cloud service on a high sustainability server operating in the cloud. The controller then presents the first and second predicted sustainability impacts to the cloud user so that the cloud user can make an informed decision with regard to the new cloud service request.
    • 使用云控制器管理云的方法和具有存储在数据库上的可执行计算机可读指令的可持续性度量管理器首先包括接收来自云用户的请求以实现具有至少一个服务特性的新云服务。 一旦接收到请求,控制器基于在云中操作的高质量服务(QoS)服务器上的云服务的实现的服务特性来计算第一可持续性影响的预测,并且还计算 基于在云中运行的高可持续性服务器上实施云服务的服务特性的第二个可持续发展影响。 然后,控制器向云用户呈现第一和第二预测的可持续发展影响,以便云用户可以对新的云服务请求做出明智的决定。
    • 126. 发明申请
    • MANAGEMENT OF A VIRTUAL POWER INFRASTRUCTURE
    • 虚拟电力基础设施管理
    • US20110307110A1
    • 2011-12-15
    • US12813012
    • 2010-06-10
    • Ratnesh Kumar SharmaAmip J. ShahCullen E. BashChih C. ShihChandrakant Patel
    • Ratnesh Kumar SharmaAmip J. ShahCullen E. BashChih C. ShihChandrakant Patel
    • G06F1/26
    • G06F1/26
    • A virtual power infrastructure for managing distribution of power to a plurality of power demanding units from a plurality of power generators includes a demand manager having logical descriptions of the power demanding units, in which the demand manager is configured to determine power load demands of the power demanding units using the logical descriptions of the power demanding units, and a capacity manager having logical descriptions of the power generators. The capacity manager is configured to determine allocation of power capacity supplied to the power generators from one or more of the power generators to meet the power load demands of the power demanding units, while satisfying one or more predetermined constraints associated with at least one of the power demanding units and the power generators.
    • 用于管理来自多个发电机的多个功率需求单元的电力分配的虚拟电力基础设施包括具有对功率需求单元的逻辑描述的需求管理器,其中需求管理器被配置为确定电力的功率负载需求 使用功率要求单元的逻辑描述的要求苛刻的单元,以及具有发电机的逻辑描述的容量管理器。 容量管理器被配置为确定从一个或多个发电机提供给发电机的功率容量的分配,以满足功率需求单元的功率负载需求,同时满足与至少一个功率发生器相关联的一个或多个预定约束 电力要求单位和发电机。