会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 94. 发明申请
    • STEEL PRODUCTION FACILITY
    • 钢铁生产设施
    • US20120006156A1
    • 2012-01-12
    • US13257411
    • 2010-03-10
    • Rafic Boulos Daou
    • Rafic Boulos Daou
    • C21B13/12F27B3/18F27B3/28F27B3/20C21C5/52F27B3/08F27B3/19
    • F27D17/004C21C5/527C21C5/5294C21C2005/5282C21C2200/00F27B3/085F27B3/18F27B3/26Y02P10/216
    • A steel production facility and a method of uninterrupted, or at least cyclical, steelmaking in the facility. In the case of uninterrupted steelmaking at least the first three of the following steps and in case of cyclical steelmaking all five steps are performed: charge materials are molten uninterruptedly or cyclically in an electric arc furnace; the charge materials (e.g., shredded scrap-iron pieces shredded in a shredding-system for shredding discarded iron and/or steel junk), Direct Reduced Iron and/or Hot Briquette Iron are uninter ruptedly or continuously during a melting process cycle fed into the electric arc furnace; a part of liquid steel is uninterruptedly or cyclically discharged from the steel bath of the electric arc furnace; from the thermic energy included in the hot process-exhaust of the electric arc furnace, electric energy is, by means of power generation, generated uninterruptedly or at least during a melting process cycle; a shredding-system assigned to the electric arc furnace for shredding the scrap is powered by the electric energy generated from the process exhaust.
    • 钢铁生产设施和在设施中不间断或至少循环炼钢的方法。 在不间断炼钢的情况下,至少要执行以下前三个步骤,并且在循环炼钢的情况下,执行所有五个步骤:充电材料在电弧炉中不间断地或周期性地熔融; 电荷材料(例如,切碎的废碎铁和/或钢垃圾粉碎系统中的碎屑铁屑),直接还原铁和/或热煤饼铁在熔化过程循环期间不间断地或连续地进入 电弧炉; 液态钢的一部分不间断地或循环地从电弧炉的钢浴排出; 根据电弧炉的热处理排气中包含的热能,电能通过发电不间断地或至少在熔化过程循环中产生; 分配给用于粉碎废料的电弧炉的粉碎系统由从工艺废气产生的电能驱动。
    • 98. 发明授权
    • Continuous steelmaking plant
    • 连续炼钢厂
    • US07279127B2
    • 2007-10-09
    • US10521307
    • 2003-07-15
    • Noel Alfred Warner
    • Noel Alfred Warner
    • C21C5/00
    • C21C5/5294C21C5/567F27B3/08F27B3/24F27B3/26F27D1/0009F27D11/04F27D17/004Y02P10/122Y02P10/128Y02P10/132Y02P10/216Y10S266/901
    • The present invention provides a process plant for the production of molten steel from primary and/or secondary ferrous materials in which no free oxygen is permitted to contact directly carbon-containing iron melts, comprising:—i) at least three pairs of furnaces (1,2; 3,4;5,6), each furnace of a pair having a hearth base (36) and being interconnected so as to form a continuous flowpath loop for molten metal, the first pair (1,2) defining an iron making loop (A) and the second and third pair (3,4;5,6) defining primary and secondary steel refining loops (B,C) respectively, (ii) means (8) for transferring molten metal from the ironmaking loop (A) to the first refining loop (B) and from the first refining loop (B) to the second refining loop (C), (iii) means for controllably supplying heat to, and removing heat from metal in the furnaces (1,2,3,4,5,6), whereby, in use a central region of metal (19a) in the furnace (1,2,3,4,5,6) becomes or is maintained in its molten state and a peripheral region of the metal (20) is maintained in a solid state such that the molten metal (19a) is contained within a stable solid shell of metal (20), said solid metal shell (20) defining the walls of the furnace (1,2,3,4,5,6), (iv) for each furnace (1,2,3,4,5,6), a removable lid (23), an enclosed space (25) being defined between the hearth (36), the lid (23) and the solid metal shell (20) defining the walls of the furnace (1,2,3,4,5,6), (v) a lifting arrangement (34,35) for controllably raising out of and lowering into the melt any plant items, so that upon shut down, said items can be removed prior to solidification of the molten metal (19a).
    • 本发明提供一种用于从初级和/或次级铁质材料生产钢水的工艺装置,其中不允许游离氧直接与含碳铁熔体接触,包括:-i)至少三对炉(1 ,2; 3,4; 5,6),每对炉具有炉底(36)并且互连以形成用于熔融金属的连续流路环,所述第一对(1,2)限定铁 (A)和第二和第三对(3,4; 5,6)分别限定主要炼钢回路(B,C),(ii)用于从炼铁回路(...)转移熔融金属的装置(8) (A)到第一精炼回路(B)和从第一精炼回路(B)到第二精炼回路(C),(iii)用于可控地向炉中的金属提供热量和从炉中除去热量的装置 ,3,4,5,6),由此,在使用中,炉子(1,2,3,4,5,6)中的金属中心区域(a1)变成或保持在其熔融状态 并且金属(20)的周边区域保持固态,使得熔融金属(197)包含在金属(20)的稳定的固体壳内,所述固体金属壳(20)限定了金属 炉子(1,2,3,4,5,6),(iv)每个炉子(1,2,3,4,5,6),可拆卸的盖子(23),被封闭的空间(25)被限定 在炉膛(36),盖(23)和限定炉壁(1,2,3,4,5,6)的固体金属壳(20)之间,(v)提升装置(34,35 ),用于可控地升高和降低任何植物物品的熔体,使得在关闭时,所述物品可以在熔融金属(a1)固化之前被移除。
    • 100. 发明申请
    • Primary products production system and method
    • 初级产品生产制度及方法
    • US20040236445A1
    • 2004-11-25
    • US10472287
    • 2003-10-21
    • Angela Bowles
    • G06F019/00
    • G06Q10/04C21C5/285C21C5/5294G06Q10/06G06Q10/08G06Q10/087Y02P10/216
    • The present invention relates to a primary product production system, and a method of supplying raw material (15) for the production. The row material (15) is provided in a manner, inter-alia, that is an improvement in the delivery and/or selection of supplied materials used. In a particular form, the product results from metal making and/or the coal industry. In a generic overall description, a customer (10) specifies a processed product as set out in an order (11) which typically includes quality and quantity of processed product such as pig iron (33) or other product, and places it. Changes (12) may also be made. This information is input to a database/computer (20) which then determines from the order (11, 12) which sources of raw materials (15) to the foundry or refinery (9) to produce a primary product which fulfils customer (10) orders (11) and/or changes (12). The raw material(s) (15) may be supplied from anynullassetnull (1-n).
    • 本发明涉及初级产品生产系统,以及用于生产原材料(15)的方法。 行材料(15)以特别的方式提供,这是所使用的供应材料的递送和/或选择的改进。 在特定形式中,产品来自金属制造和/或煤炭工业。 在一般的整体描述中,客户(10)按照通常包括诸如生铁(33)或其他产品的加工产品的质量和数量的顺序(11)来指定加工产品,并将其放置。 更改(12)也可以进行。 该信息被输入到数据库/计算机(20),然后数据库/计算机(20)从订单(11,12)确定哪个原料源(15)到铸造厂或炼油厂(9)以产生满足客户(10)的主要产品 订单(11)和/或更改(12)。 原料(15)可以从任何“(1-n)”提供。