会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Foundation structure
    • 基金会结构
    • JP2014105477A
    • 2014-06-09
    • JP2012258901
    • 2012-11-27
    • Taisei Corp大成建設株式会社
    • KISHIDA TSUNEAKINAKANISHI HOMARETANAKA HIROYASUSAKAMI TAKUYA
    • E02D27/12
    • PROBLEM TO BE SOLVED: To provide a foundation structure capable of securing sufficient bearing resistance with pile members even for soft ground.SOLUTION: A foundation structure 1 comprises a foundation fixture 10 and four pieces of steel pipes 20 fixed to the foundation fixture 10. The foundation fixture 10 has a bowl-shaped main body 11, four pieces of cylinder sections 12 provided on the main body 11 and into which the steel pipes 20 are inserted, and bolts 30 to fix the steel pipes 20 to the cylinder sections 12. Central axes of the four cylinder sections 12 are inclined with respect to an axial direction of the main body 11 and extended without interfering with each other. At least portions of the four pieces of steel pipes 20 are buried in the ground.
    • 要解决的问题:提供一种即使对于软土也能够确保桩构件的足够的承受阻力的基础结构。解决方案:基础结构1包括固定在基础固定装置10上的基础固定装置10和四个钢管20。 基座固定件10具有碗形主体11,设置在主体11上的钢管20插入的四个圆筒部12和将钢管20固定在圆筒部12上的螺栓30。 四个圆筒部12的轴线相对于主体11的轴向倾斜并且不会彼此干涉地延伸。 四块钢管20的至少一部分埋在地面上。
    • 2. 发明专利
    • Foundation structure
    • 基金会结构
    • JP2014125756A
    • 2014-07-07
    • JP2012281868
    • 2012-12-25
    • Taisei Corp大成建設株式会社
    • KISHIDA TSUNEAKINAKANISHI HOMARETANAKA HIROYASUSAKAMI TAKUYA
    • E02D27/12
    • PROBLEM TO BE SOLVED: To provide a foundation structure capable of surely transmitting a bearing capacity by a steel pipe even in soft ground.SOLUTION: A foundation structure 1 includes: a jig 10 for a foundation; and four steel pipes 20 fixed to the jig 10 for the foundation. The jig 10 for the foundation includes: a spherical and concrete main body 11; and four insertion parts 12 provided by penetrating the main body 11 to insert the steel pipes 20. The central axis of the four insertion parts 12 inclines toward the axial direction of the main body 11 and extends without interfering each other. The insertion parts 12 includes a pair of through-holes 14 formed by facing each other to the main body 11. Cement mortar, concrete or hardening resin is filled into a space between the steel pipes 20 and the insertion parts 12 in a state that each of the steel pipes 20 is inserted into the insertion parts 12.
    • 要解决的问题:提供一种即使在软土中也能够通过钢管可靠地传递承载能力的基础结构。解决方案:基础结构1包括:用于基础的夹具10; 以及固定在基础用夹具10上的四根钢管20。 用于基础的夹具10包括:球形和混凝土主体11; 以及通过贯通主体11而插入钢管20而设置的四个插入部12.四个插入部12的中心轴朝向主体11的轴向倾斜并且不会彼此干涉地延伸。 插入部12包括一对相对于主体11形成的通孔14.水泥砂浆,混凝土或硬化树脂以各自的状态填充到钢管20和插入部12之间的空间中 的钢管20插入到插入部12中。