会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明专利
    • Junction structure of precast members and cap for mechanical joint unit injection used therefor
    • 预制构件的结构结构和用于其的机械接头单元注入
    • JP2014105440A
    • 2014-06-09
    • JP2012257191
    • 2012-11-26
    • Kajima Corp鹿島建設株式会社
    • OKAMOTO KENJINABESHIMA TAKEHIKOOGIWARA YUKIMASASHINBASHI MASAHIROMATSUI MORIFUSA
    • E04B1/21E04C5/18
    • PROBLEM TO BE SOLVED: To provide a cap for mechanical joint unit injection with which construction efficiency is significantly improved by rotating a nut, any labor is not required for mounting adjustment since the cap is compressed and deformed by contact with a PC member, injection can be performed by a manual injector and divided injection can also be performed.SOLUTION: A junction structure of precast members includes a first precast member 1, a second precast member 2 in which a sleeve 23 for a joint is buried, a cap 14 closing an opening of the sleeve (joint) 23, and a sleeve joint filler 4 filling the inside of the sleeve (joint) 23. A joint part between a concrete part 11 of the first precast member 1 and a concrete part 21 of the second precast member 2 is filled with a joint filler 5. The cap 14 is formed from a flexible member which is compressed and deformed by contact with the precast members, mounted to a joint bar 13 protruding from the concrete part of the first precast member 2, and is positioned in the joint filler 5.
    • 要解决的问题:为了提供用于机械接头单元喷射的盖,通过旋转螺母来显着改善施工效率,由于盖通过与PC构件的接触而被压缩和变形,因此安装调整不需要任何劳动,注射罐 也可以通过手动喷射器执行分割喷射。解决方案:预制构件的连接结构包括第一预制构件1,第二预制构件2,其中埋设有用于接头的套筒23,盖14关闭 套筒(接头)23的开口以及填充套筒(接头)23内部的套筒接合填料4.第一预制构件1的混凝土部件11与第二预制构件的混凝土部件21之间的接合部分 盖14由接合填料5填充。盖14由柔性构件形成,该柔性构件通过与预制构件接触而被压缩和变形,安装到从第一预制件的混凝土部分突出的接头杆13 构件2,并且定位在接头填料5中。