热词
    • 3. 发明申请
    • ENERGY SCHEDULING TO A LOAD IN BUILDING AUTOMATION SYSTEM
    • 能量调度到建筑自动化系统中的负载
    • WO2014005616A1
    • 2014-01-09
    • PCT/EP2012/062834
    • 2012-07-02
    • ABB RESEARCH LTDHANSEN, EwaLENNVALL, TomasRIZVANOVIC, LarisaROSSEBØ, JudithSTOLL, Pia
    • HANSEN, EwaLENNVALL, TomasRIZVANOVIC, LarisaROSSEBØ, JudithSTOLL, Pia
    • G06Q50/06
    • G06Q50/06
    • The present disclosure relates to a method of determining a schedule for energy delivery to at least one load in a building automation system. The method comprises acquiring an association between at least two parameters and a schedule for delivery of energy to at least one load in accordance with acquired energy need for the at least one load, each one of the at least two parameters relating to priority of a respective property associated with the delivery of energy. The method further comprises receiving end-user selection data relating to weighting of the at least two parameters for the at least one load. The method further comprises determining the schedule for the energy delivery to the at least one load based on the weighting of the at least two parameters. A computer program and an energy management unit are also disclosed herein.
    • 本公开涉及一种确定在建筑物自动化系统中对至少一个负载的能量递送的调度表的方法。 该方法包括获取至少两个参数之间的关联和根据所获得的至少一个负载的能量需求将能量递送到至少一个负载的调度,所述至少两个参数中的每一个参数与相应的 与能源交付相关的财产。 该方法还包括接收与至少一个负载的至少两个参数的加权相关的最终用户选择数据。 该方法还包括基于至少两个参数的加权来确定到至少一个负载的能量递送的调度。 本文还公开了一种计算机程序和能量管理单元。
    • 5. 发明申请
    • A MULTI-NETWORK MANAGER, METHOD AND SYSTEM
    • 多网络管理者,方法和系统
    • WO2010072806A1
    • 2010-07-01
    • PCT/EP2009/067845
    • 2009-12-23
    • ABB RESEARCH LTDLENNVALL, TomasSECELEANU, Tiberiu
    • LENNVALL, TomasSECELEANU, Tiberiu
    • H04W16/14
    • H04W16/14H04W72/1231
    • It is presented a method for reducing interference between wireless networks for industrial devices. The method comprises the steps of : obtaining a first resource schedule of a first wireless network manager; obtaining a second resource schedule of a second wireless network manager; determining whether there are resource conflicts between the first resource schedule and the second resource schedule; and providing, when at least one resource conflict is determined, a new wireless resource schedule for the first wireless network manager to avoid at least part of the determined resource conflicts. A corresponding multi-network manager, system and computer program product are also presented.
    • 提出了一种减少工业设备无线网络之间干扰的方法。 该方法包括以下步骤:获得第一无线网络管理器的第一资源调度; 获得第二无线网络管理器的第二资源调度; 确定所述第一资源调度和所述第二资源调度之间是否存在资源冲突; 以及当确定至少一个资源冲突时,提供用于所述第一无线网络管理器的新的无线资源调度以避免所确定的资源冲突的至少一部分。 还提出了相应的多网络管理器,系统和计算机程序产品。
    • 6. 发明申请
    • MEETING A COMMUNICATION RESTRICTION REQUIREMENT IN A PROCESS CONTROL SYSTEM
    • 会议过程控制系统中的通信限制要求
    • WO2012055430A1
    • 2012-05-03
    • PCT/EP2010/066177
    • 2010-10-26
    • ABB RESEARCH LTDSECELEANU, TiberiuLENNVALL, Tomas
    • SECELEANU, TiberiuLENNVALL, Tomas
    • G05B19/418H04W16/00
    • H04W24/04G05B19/4185H04W28/08H04W84/18Y02P90/18
    • An industrial process control system (10) comprises a process control device (12), a first wireless communication network (11), a second wxreless communication network (27) and a first group of wireless field devices (16, 18, 20, 22, 24, 26) interfacing the industrial process and being associated with the first network. The network supervisor device investigates if the field devices of the first group are able to communicate with the process control device via the first network while meeting a communication restriction requirement (ΔT), and redirects, in case the requirement is not met, communication between some of the field devices in the first group and the process control device to the second network so that the requirement is met for a first part (16, 18, 20) of the field devices using the first wireless communication network and for a second part (22, 24, 26) of the field devices using the second wireless communication network.
    • 工业过程控制系统(10)包括过程控制设备(12),第一无线通信网络(11),第二无缝通信网络(27)和第一组无线现场设备(16,18,20,22) ,24,26),其连接工业过程并与第一网络相关联。 网络监控设备调查第一组的现场设备是否能够在满足通信限制要求(ΔT)的情况下通过第一网络与过程控制设备进行通信,并且如果不满足要求,则重定向通信 第一组中的一些现场设备和到第二网络的过程控制设备,使得使用第一无线通信网络的现场设备的第一部分(16,18,20)和第二部分(16,18,20)满足要求 (22,24,26)使用第二无线通信网络的现场设备。