基本信息:
- 专利标题: 전력 수용가에 설치된 ESS의 충방전 알고리즘 예측 시스템
- 专利标题(英):KR101836439B1 - System for predicting charging and discharging algorithm of energy storage system installed power consumer
- 专利标题(中):电力用户安装ESS充放电算法预测系统
- 申请号:KR1020170111868 申请日:2017-09-01
- 公开(公告)号:KR101836439B1 公开(公告)日:2018-03-09
- 发明人: 김수정
- 申请人: 주식회사 텔다
- 申请人地址: 서울특별시 강북구 덕릉로**길 **, ***호 (번동,강북전자공단)
- 专利权人: 주식회사 텔다
- 当前专利权人: 주식회사 텔다
- 当前专利权人地址: 서울특별시 강북구 덕릉로**길 **, ***호 (번동,강북전자공단)
- 代理人: 특허법인메이저
- 主分类号: H02J3/32
- IPC分类号: H02J3/32 ; H02J3/00
The present invention predicts the accuracy high demand loads that, the technical problem to be solved is through the analysis of the various factors that affect the demand load data with the demand load on the charging and discharging algorithm prediction system of ESS installed in the power suyongga, Based on this and providing a peak time of day energy storage and more through the effective charge and discharge control economics and reliability is enhanced optimal power supply when the system is introduced into the power suyongga to implement charging and discharging algorithm of the energy storage system through the estimate calculated, the electric power fee It is to reduce.
In one example, the target power suyongga demand load data in a recent period of time, climate data, and time and seasonal power data acquisition unit for collecting and processing the pattern data; The data collected extraction part on the data collected at regular time intervals, respectively through, and the extracted data through the multiple regression analysis is applied to the argument estimate the demand load forecast for the future demand load, based on the demand load predicted estimate data estimator for estimating a peak load demand; Data setting unit for setting a demand load reduction target value for the peak load demand estimated by the data estimating portion; Each classified according to the demand load reference range with the data estimating unit is set beforehand the demand load predicted estimate over time, and performing the magnitude comparison between the classification demand load forecast the demand load reduction target value set through the said data set, and each comparison result generation algorithm to generate the charge and discharge of the algorithm ESS each unit in accordance with; And it calculates a charge-discharge estimate of the ESS, and the charging and discharging algorithm prediction of ESS containing portion based on the calculated discharge estimate generation data for generating control data of the ESS according to the charging and discharging algorithm generated by a generator the algorithm It discloses a system.
信息查询:
EspacenetIPC结构图谱:
H | 电学 |
--H02 | 发电、变电或配电 |
----H02J | 供电或配电的电路装置或系统;电能存储系统 |
------H02J3/00 | 交流干线或交流配电网络的电路装置 |
--------H02J3/28 | .用储能方法在网络中平衡负载的装置 |
----------H02J3/32 | ..应用有变换装置的电池组 |