基本信息:
- 专利标题: 지하 전력구내 전선 케이블 방화 장치
- 专利标题(英):Anti fire provision for cable in underground power tunnel
- 专利标题(中):地下电力隧道电缆防火设施
- 申请号:KR1020140191649 申请日:2014-12-29
- 公开(公告)号:KR101504128B1 公开(公告)日:2015-03-19
- 发明人: 김필성
- 申请人: (주)해우엔지니어링건축사사무소
- 申请人地址: 경기도 성남시 수정구 복정로 *** , ***호(복정동)
- 专利权人: (주)해우엔지니어링건축사사무소
- 当前专利权人: (주)해우엔지니어링건축사사무소
- 当前专利权人地址: 경기도 성남시 수정구 복정로 *** , ***호(복정동)
- 主分类号: H02G9/10
- IPC分类号: H02G9/10 ; G01K1/02 ; H02B1/28 ; H02B13/025 ; H02G3/04
The present invention provides an on-site underground power cable wire fire protection device. The on-site underground power cable wire fire protection apparatus wires fixed frame 100 and form a multi-stage; Is fixed to the wire fixing frame 100, the wire (1) is a first through hole 201 that penetrates is formed, one end, the first protective tube (210) insertable and protrudes is formed, and the other end provided with a first insertion groove a plurality of first wire protecting case 200 that (220) is formed with; Is fixed to the wire fixing frame 100 to be positioned between the plurality of first wire protecting case 200, the second through holes 301 are wire (1) passes through is formed, and one end is inserted and possible projecting second protective tube a plurality of second wire protecting case 300 (310) is formed and the other end has a second groove 320 is formed; And when forming a reference temperature or higher is the ambient temperature of the plurality of first wire protecting case 200 and the plurality of second wire protecting case 300 previously set, by extruding the first protective tube (210) wherein the 2, insert the insertion groove 320, and includes the second protection pipe fire protection safety module 400 to control by projecting the 310 so as to sandwich the first groove 220.
信息查询:
EspacenetIPC结构图谱:
H | 电学 |
--H02 | 发电、变电或配电 |
----H02G | 电缆或电线的安装,或光电组合电缆或电线的安装 |
------H02G9/00 | 在地面或地下,或水面或水中敷设电线或电缆 |
--------H02G9/10 | .在电缆室中,例如在人孔中、在手孔中 |