JP2014185445A Construction method of vertical pipe and temporary jig device for vertical pipe construction
有权
基本信息:
- 专利标题: Construction method of vertical pipe and temporary jig device for vertical pipe construction
- 专利标题(中):垂直管道施工方法及垂直管道施工的临时设备
- 申请号:JP2013060026 申请日:2013-03-22
- 公开(公告)号:JP2014185445A 公开(公告)日:2014-10-02
- 发明人: IWATA YOJI
- 申请人: Sanki Eng Co Ltd , 三機工業株式会社
- 专利权人: Sanki Eng Co Ltd,三機工業株式会社
- 当前专利权人: Sanki Eng Co Ltd,三機工業株式会社
- 优先权: JP2013060026 2013-03-22
- 主分类号: E04G21/14
- IPC分类号: E04G21/14 ; E03C1/00 ; F16L1/00
摘要:
PROBLEM TO BE SOLVED: To provide a construction method of a vertical pipe, capable of more smoothly performing carrying-in of a pipe material, and a temporary jig device for constructing the vertical pipe.SOLUTION: In a pipe shaft 2, a hanging device 11 for hanging down pipe materials 4 constituting a vertical pipe 3 is installed on the uppermost floor among floors where construction of the vertical pipe 3 is performed, and a guide wire 31 is vertically extended in a state of tension from the installation floor of the hanging device 11 to the lowest floor among the floors where the construction of the vertical pipe 3 is performed. When hanging the pipe materials, with one end to which a connection member 21 detachably connected to a hook 17 provided at a lower end of a wire rope 16 of the hanging device 11 is detachably attached, by the hanging device 11, the wire rope 16 and a central axis of the pipe material 4 are positioned on the same virtual straight line extending in the vertical direction. A helping tool 41 with one end connected to the side of the pipe materials 4 and the other end vertically slidably locked to the guide wire 31 is attached, and then the pipe materials 4 are hung down to the installation floor and are connected to a connection destination.
摘要(中):
要解决的问题:提供能够更顺利地进行管材的携带的立管的施工方法和用于构造立管的临时夹具装置。解决方案:在管轴2中,悬挂装置 在垂直管3的构造的楼层中,最上层的地板上安装有构成立管3的管道材料11的11,在垂直管3的安装地板处于拉伸状态下垂直延伸的导丝31 装置11到达垂直管3的结构的地板中的最低层。 当悬挂管材时,通过悬挂装置11可拆卸地连接有可拆卸地连接到设置在悬挂装置11的钢丝绳16的下端的钩17的连接构件21的一端,钢丝绳16 并且管材4的中心轴线位于沿垂直方向延伸的相同虚拟直线上。 安装有一端与管材4的一端相连的辅助工具41,另一端垂直滑动地锁定在导丝31上,然后将管材4挂在安装地面上,并连接到连接件 目的地。
公开/授权文献:
- JP6125289B2 立管の施工方法及び立管施工のための仮設治具装置 公开/授权日:2017-05-10
信息查询:
EspacenetIPC结构图谱:
E | 固定建筑物 |
--E04 | 建筑物 |
----E04G | 脚手架、模壳;模板;施工用具或其他建筑辅助设备,或其应用;建筑材料的现场处理;原有建筑物的修理,拆除或其他工作 |
------E04G21/00 | 建筑材料或建筑构件在现场的制备,搬运或加工;施工中采用的其他方法和设备 |
--------E04G21/14 | .建筑构件的运输或装配 |