基本信息:
- 专利标题: 与电缆构筑物一体化的电缆终端平台联合式基础
- 专利标题(英):And cable terminal platform combined foundation is integrated with cable structure
- 申请号:CN201822207516.X 申请日:2018-12-27
- 公开(公告)号:CN209555960U 公开(公告)日:2019-10-29
- 发明人: 陈孝湘 , 陈文兴 , 黄明祥 , 林智侃 , 肖方顺 , 宋平 , 刘沁 , 陈晓莉 , 李金赐 , 郑凤林 , 李扬森 , 武奋前 , 刘文亮 , 陈培铭 , 吴勤斌 , 吴培贵 , 张昊 , 林宇彬 , 黄建涛 , 薛颖 , 叶琦棽
- 申请人: 中国电建集团福建省电力勘测设计院有限公司 , 国网福建省电力有限公司 , 国网福建省电力有限公司建设分公司 , 国网福建省电力有限公司经济技术研究院
- 申请人地址: 福建省福州市鼓楼区五四路268号
- 专利权人: 中国电建集团福建省电力勘测设计院有限公司,国网福建省电力有限公司,国网福建省电力有限公司建设分公司,国网福建省电力有限公司经济技术研究院
- 当前专利权人: 中国电建集团福建省电力勘测设计院有限公司,国网福建省电力有限公司,国网福建省电力有限公司建设分公司,国网福建省电力有限公司经济技术研究院
- 当前专利权人地址: 福建省福州市鼓楼区五四路268号
- 代理机构: 福州展晖专利事务所
- 代理人: 陈如涛
- 主分类号: E02D27/01
- IPC分类号: E02D27/01 ; E02D27/42
The utility model relates to infrastructure in power transmission line engineering. The utility model relates to a foundation, in particular to a cable terminal platform combined foundation integratedwith a cable structure. The platform comprises a cable structure and a platform supporting foundation, the key points of the structure are that: the structure is simple, the device further comprisesa combined bottom plate, the combined bottom plate is an integral flat plate; the platform supporting foundations are located on the upper plane of the combined bottom plate and are perpendicular to the combined bottom plate, the cable structure is located between the two platform supporting foundations, the vertical central axis of the cable structure is also perpendicular to the combined bottomplate, and the cable structure, the platform supporting foundations and the combined bottom plate are integrally poured to form an integrated structure. The foundation structure has the advantages that overall cooperative stress, uniform settlement and uniform deformation are achieved, so that the stability and safety of the foundation structure are effectively improved, and investment and the construction period can be reasonably saved through one-time excavation and joint construction.
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02D | 基础;挖方;填方;地下或水下结构物 |
------E02D27/00 | 作为下部结构的基础 |
--------E02D27/01 | .扁平基础 |