![一种道路建设施工用围挡板的成型装置](/CN/2018/2/365/images/201821827976.jpg)
基本信息:
- 专利标题: 一种道路建设施工用围挡板的成型装置
- 专利标题(英):Forming device of fence plate for road construction
- 申请号:CN201821827976.6 申请日:2018-11-07
- 公开(公告)号:CN208991546U 公开(公告)日:2019-06-18
- 发明人: 张文浩 , 徐钦升 , 王洪国 , 范俊瑛 , 陈伟 , 闫翔鹏 , 许超 , 贾元法 , 刘刚 , 陈婷婷 , 孙兆云 , 季正军 , 耿汝超
- 申请人: 山东省交通科学研究院 , 山东高速潍日公路有限公司
- 申请人地址: 山东省济南市历城区港沟街道港西路1877号
- 专利权人: 山东省交通科学研究院,山东高速潍日公路有限公司
- 当前专利权人: 山东省交通科学研究院,山东高速潍日公路有限公司
- 当前专利权人地址: 山东省济南市历城区港沟街道港西路1877号
- 代理机构: 济南竹森知识产权代理事务所
- 代理人: 孙宪维; 吕利敏
- 主分类号: B21D13/04
- IPC分类号: B21D13/04
The utility model relates to the technical field of road construction, in particular to a forming device of a fence plate for road construction, which comprises a rack, a lower male die, a pressing and rolling mechanism, a chain transmission mechanism, a connecting piece and a speed reducing motor, the plurality of lower male dies are fixedly arranged on the rack at intervals; the pressing and rolling mechanism comprises a sliding support and a plurality of pressing and rolling units corresponding to the lower male dies. The pressing roller unit comprises a pressing roller bracket, a middle roller, a side roller, a vertical spring, a left spring and a right spring; the vertical spring is used for generating a vertically downward acting force on the pressing roller bracket; the side rollersare located on two sides of the middle roller; the left and right springs are used for generating acting force towards the middle roller; a groove formed by the middle roller and the side rollers ismatched with the lower male die; and the chain transmission mechanism can drive the sliding bracket to reciprocate back and forth through the connecting piece during one-way transmission. The formingdevice of the fence plate for road construction is low in cost, small in occupied space and easy to maintain, the influence on the workshop environment can be reduced, automatic adjustment can be achieved according to the thickness of a plate blank, and the size precision of the machined fence plate for road construction is high.
IPC结构图谱:
B | 作业;运输 |
--B21 | 基本上无切削的金属机械加工;金属冲压 |
----B21D | 金属板或管、棒或型材的基本无切削加工或处理;冲压 |
------B21D13/00 | 金属板、金属棒或金属型材的起皱;金属板、金属棒或金属型材弯曲成波形 |
--------B21D13/04 | .用滚轧 |