![一种盾构下穿既有地铁车站围护结构加固系统](/CN/2017/2/0/images/201720004172.jpg)
基本信息:
- 专利标题: 一种盾构下穿既有地铁车站围护结构加固系统
- 专利标题(英):Under constructing, wears by shield existing subway station envelope reinforcerment system
- 申请号:CN201720004172.5 申请日:2017-01-04
- 公开(公告)号:CN206467684U 公开(公告)日:2017-09-05
- 发明人: 邹洪宝 , 薛立强 , 王耀东 , 刘伟 , 王艳国 , 谷任国 , 单宏祥 , 黄晓烽 , 张森 , 娄雨 , 尹振超 , 孙建 , 马立根 , 程思远 , 朱京林
- 申请人: 中铁十六局集团北京轨道交通工程建设有限公司 , 中铁十六局集团有限公司 , 华南理工大学
- 申请人地址: 北京市通州区于家务回族乡聚富苑民族产业发展基地聚和六街2号; ;
- 专利权人: 中铁十六局集团北京轨道交通工程建设有限公司,中铁十六局集团有限公司,华南理工大学
- 当前专利权人: 中铁十六局集团北京轨道交通工程建设有限公司,中铁十六局集团有限公司,华南理工大学
- 当前专利权人地址: 北京市通州区于家务回族乡聚富苑民族产业发展基地聚和六街2号; ;
- 代理机构: 广州市华学知识产权代理有限公司
- 代理人: 罗观祥
- 主分类号: E02D29/00
- IPC分类号: E02D29/00 ; E02D17/04 ; E02D19/10
The utility model discloses an under constructing, wears by shield existing subway station envelope reinforcerment system, include: first reinforcement district for in the existing station outside, keeps away from newly -built station foundation pit another side envelope, hugs closely the stake of spouting soon of its construction and consolidates the district, the district is consolidated to the second, consolidates the district for the method of freezing that the subway envelope who hugs closely the sharing of existing station and newly -built station was under construction, should consolidate to distinguish and lean on existing station one side, the district is consolidated to the third, consolidates the district for the single RJP stake that the subway envelope who hugs closely the sharing of existing station and newly -built station was under construction, should consolidate and distinguish by newly -built station one side, dive precipitation well is established inside newly -built station foundation pit, the usefulness of double as confined level peephole is established outside newly -built station foundation pit to reserve pressure -bearing water precipitation well. The utility model discloses can effectively improve next -door neighbour's envelope soil body from stability and bearing capacity, reduce the shield and construct into the hole, gush swelling sand risk when arriving at a station, reduce the operation influence of existing station.
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02D | 基础;挖方;填方;地下或水下结构物 |
------E02D29/00 | 地下或水下结构物;挡土墙 |