![一种适用于箱梁节段预制施工钢筋绑扎的装置](/CN/2013/2/98/images/201320490200.jpg)
基本信息:
- 专利标题: 一种适用于箱梁节段预制施工钢筋绑扎的装置
- 专利标题(英):Device applicable to box girder section prefabrication construction rebar binding
- 申请号:CN201320490200.0 申请日:2013-08-12
- 公开(公告)号:CN203391096U 公开(公告)日:2014-01-15
- 发明人: 王波 , 何开伟 , 刘泽 , 金洲 , 严鑫 , 王莉
- 申请人: 中铁二局股份有限公司 , 中铁二局第四工程有限公司
- 申请人地址: 四川省成都市高新区九兴大道高发大厦B幢一层156号
- 专利权人: 中铁二局股份有限公司,中铁二局第四工程有限公司
- 当前专利权人: 中铁二局集团有限公司
- 当前专利权人地址: 四川省成都市高新区九兴大道高发大厦B幢一层156号
- 代理机构: 四川力久律师事务所
- 代理人: 熊晓果; 王芸
- 主分类号: B28B23/14
- IPC分类号: B28B23/14
The utility model relates to the field of civil engineering and particularly relates to a device applicable to box girder section prefabrication construction rebar binding. The device comprises channel steels, I-shaped steels, angle steels and positioning clamps. An outer frame skeleton is formed by the channel steels, the whole outer frame skeleton is similar to a cuboid, and the I-shaped steels are horizontally and longitudinally distributed on the upper surfaces of the channel steels below and above the outer frame skeleton. The angle steels and the I-shaped steels are arranged in the same direction, the outer surfaces of the angle steels are welded on the upper surfaces of the I-shaped steels in a single-side mode, the lengths of the single sides of the cross sections of the angle steels are smaller than or equal to the lengths of cross sections of the upper surfaces of the I-shaped steels, and semicircular grooves are opened at intervals according to design in the sides of the angle steels, which are not welded. The positioning clamps are arranged at the front end and the rear end of the outer frame skeleton. By means of the device, rebar binding is high in efficiency and accuracy.
IPC结构图谱:
B | 作业;运输 |
--B28 | 加工水泥、黏土或石料 |
----B28B | 黏土或其他陶瓷成分、熔渣或含有水泥材料的混合物,例如灰浆的成型 |
------B28B23/00 | 专门适用于制造全部或部分元件埋入造型材料内的成型制品的装置 |
--------B28B23/02 | .其中元件为加筋构件 |
----------B28B23/04 | ..元件是预应力的 |
------------B28B23/12 | ...形成周圈预应力钢筋 |
--------------B28B23/14 | ....用包扎,例如缠绕装置的 |