- 专利标题: LNG储罐阶段保压穹顶混凝土分层分环浇筑控制方法
- 专利标题(英):Layered and sub-ring pouring controlling method for dome concrete through stage pressure holding of LNG storage tank
- 申请号:CN201911035016.5 申请日:2019-10-29
- 公开(公告)号:CN110761469A 公开(公告)日:2020-02-07
- 发明人: 段品佳 , 张超 , 毕晓星 , 范嘉堃 , 王佳音 , 安东雨 , 刘洋 , 夏梦莹
- 申请人: 中海石油气电集团有限责任公司
- 申请人地址: 北京市朝阳区太阳宫南街6号院中海油大厦C座
- 专利权人: 中海石油气电集团有限责任公司
- 当前专利权人: 中海石油气电集团有限责任公司
- 当前专利权人地址: 北京市朝阳区太阳宫南街6号院中海油大厦C座
- 代理机构: 北京纪凯知识产权代理有限公司
- 代理人: 李晓红
- 主分类号: E04B7/08
- IPC分类号: E04B7/08 ; E04G21/02 ; E04H7/18
The invention discloses a layered and sub-ring pouring controlling method for dome concrete through stage pressure holding of an LNG storage tank. The method comprises the following steps that (1) ring-direction pre-stress tensioning of the lower ring beam of a ring beam (1) is conducted; (2) air pressure jacking of a section steel net shell structure of a dome is conducted; (3) the pouring layerof the dome is divided into a first pouring layer and a second pouring layer from bottom to top, and each pouring layer is divided into multiple-stage annular areas Bj (j = 1,...,m, wherein m is no less than 2) from outside to inside; (4) concrete pouring of the first-stage annular area B1 of the first pouring layer is conducted, after the concrete of the first-stage annular area B1 of the first pouring layer reaches the preset strength value, pressurizing into the tank is conducted to the preset pressure, stage-by-stage continuous pouring of the first pouring layer is conducted in an in-tankpressure holding state, and the maintenance work is conducted; and (5), in-tank pressure is released, stage-by-stage continuous pouring of the second pouring layer is conducted, and the construction seam between the second pouring layer and the first pouring layer is in staggered lap joint.