![一种大坝填筑加水洗车系统](/CN/2019/1/223/images/201911119838.jpg)
基本信息:
- 专利标题: 一种大坝填筑加水洗车系统
- 专利标题(英):Dam filling water adding vehicle cleaning system
- 申请号:CN201911119838.1 申请日:2019-11-15
- 公开(公告)号:CN110714466A 公开(公告)日:2020-01-21
- 发明人: 刘玉成 , 纵向群 , 钱继源 , 刘延科 , 钟金盛 , 叶林 , 林文 , 王杨虹
- 申请人: 安徽金寨抽水蓄能有限公司 , 国网新源控股有限公司 , 国家电网有限公司 , 中国水利水电建设工程咨询北京有限公司
- 申请人地址: 安徽省六安市金寨县梅山镇红军大道县交通运输局内
- 专利权人: 安徽金寨抽水蓄能有限公司,国网新源控股有限公司,国家电网有限公司,中国水利水电建设工程咨询北京有限公司
- 当前专利权人: 安徽金寨抽水蓄能有限公司,国网新源控股有限公司,国家电网有限公司,中国水利水电建设工程咨询北京有限公司
- 当前专利权人地址: 安徽省六安市金寨县梅山镇红军大道县交通运输局内
- 代理机构: 合肥中博知信知识产权代理有限公司
- 代理人: 李金标
- 主分类号: E02D15/00
- IPC分类号: E02D15/00 ; F17D1/14 ; B01D21/02
The invention discloses a dam filling water adding vehicle cleaning system. A pit is dug in a driving road, the pit is supported by a steel pipe, one side of the driving road is provided with a sedimentation tank, one side of the sedimentation tank communicates with the pit, and the other side of the sedimentation tank is provided with an overflow hole; the pit are provided with stand columns, andthe stand columns are arranged on the two sides of the pit; the system further comprises a water supply system, wherein the water supply system particularly comprises a submersible electric pump, a water supply pipeline and a water spraying pipeline; one end of the water supply pipeline is connected with the submersible electric pump, the other end of the water supply pipeline is connected with the water spraying pipeline, and the water spraying pipeline is provided with water spraying openings; and the water spraying pipeline is divided into an upper pipeline and a lower pipeline, the upperpipeline is erected at the top ends of the stand columns, the lower pipeline is connected to the lower part of the steel pipe, and the water spraying openings of the upper pipeline and the lower pipeline are opposite up and down. The upper pipeline is used for adding water in the air, a vehicle drives slowly during water adding, and when the vehicle passes the vehicle length distance, all water isdirectly sprayed into the whole compartment; and the lower pipeline is adopted for flushing flowing sewage and purifying the vehicle.
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02D | 基础;挖方;填方;地下或水下结构物 |
------E02D15/00 | 水利工程或基础的建筑材料或类似材料的处置 |