![一种穿越箱涵的通道复杂支撑施工方法](/CN/2019/1/104/images/201910520262.jpg)
基本信息:
- 专利标题: 一种穿越箱涵的通道复杂支撑施工方法
- 专利标题(英):Complicated supporting construction method of passage passing through box culvert
- 申请号:CN201910520262.3 申请日:2019-06-17
- 公开(公告)号:CN110219256A 公开(公告)日:2019-09-10
- 发明人: 王丽梅 , 户潇博 , 王保华 , 张振禹 , 郭建东
- 申请人: 中建六局土木工程有限公司 , 中国建筑第六工程局有限公司
- 申请人地址: 天津市滨海新区开发区洞庭路66号中建大厦
- 专利权人: 中建六局土木工程有限公司,中国建筑第六工程局有限公司
- 当前专利权人: 中建六局土木工程有限公司,中国建筑第六工程局有限公司
- 当前专利权人地址: 天津市滨海新区开发区洞庭路66号中建大厦
- 代理机构: 天津市北洋有限责任专利代理事务所
- 代理人: 王丽英
- 主分类号: E01F5/00
- IPC分类号: E01F5/00 ; E02D5/34 ; E02D17/04
The invention discloses a complicated supporting construction method of a passage passing through a box culvert. The complicated supporting construction method of the passage passing through the box culvert comprises the steps of excavating covering soil at the top and the left and right external side w of the box culvert to the bottom wall of the box culvert according to a set position of the passage passing through the box culvert so as to to form a foundation pit; correspondingly arranging three right side manual digging filling piles and a left side manual digging filling pile on the rightand left side walls of the box culvert in sequence; grouting in a soil body between the manual digging filling piles on the right and left sides; continuing to cut through and excavate downwards fromthe right side of the bottom wall of the foundation pit to the left side of the bottom wall of the foundation pit; erecting a scaffold at the same time of excavating in the excavating process; erecting three steel pipe supporting columns in the middle of the bottom wall of the box culvert; correspondingly building pedestrian passageway side walls on the two sides of a construction passage; pouring a pedestrian passageway top plate at the top of a pedestrian passageway; and blocking a hole in the pedestrian passageway top plate in the corresponding position of each steel pipe supporting column. According to the complicated supporting construction method of the passage passing through the box culvert, the excavating safety and the passage main body construction structure safety are guaranteed.
公开/授权文献:
- CN110219256B 一种穿越箱涵的通道复杂支撑施工方法 公开/授权日:2021-02-19
IPC结构图谱:
E | 固定建筑物 |
--E01 | 道路、铁路或桥梁的建筑 |
----E01F | 附属工程,例如,道路设备和月台、直升机降落台、标志、防雪栅等的修建 |
------E01F5/00 | 道路底层或铁路道碴层的沟槽、涵洞、管道排水 |