基本信息:
- 专利标题: 一种适应于重交通碾压的隧道中心检查井井盖施工方法
- 专利标题(英):Construction method of tunnel center inspection well lid adaptive to heavy traffic rolling
- 申请号:CN201910502641.X 申请日:2019-06-11
- 公开(公告)号:CN110158660A 公开(公告)日:2019-08-23
- 发明人: 梁栋 , 胡平 , 冯科科 , 王云鹏 , 庞峰
- 申请人: 陕西路桥集团有限公司
- 申请人地址: 陕西省西安市雁塔区吉祥路306号
- 专利权人: 陕西路桥集团有限公司
- 当前专利权人: 陕西路桥集团有限公司
- 当前专利权人地址: 陕西省西安市雁塔区吉祥路306号
- 代理机构: 西安毅联专利代理有限公司
- 代理人: 杨燕珠
- 主分类号: E02D29/14
- IPC分类号: E02D29/14
The invention provides a construction method of a tunnel center inspection well lid adaptive to heavy traffic rolling. The construction method of the tunnel center inspection well lid adaptive to theheavy traffic rolling includes following steps: step 1, prefabricating a lid plate; step 2, setting the midpoint of an inspection well as the center, and chiseling a lid plate groove from the center to the periphery of the inspection well; step 3, using mortar for levelling the bottom of the lid plate groove, and burying a metal bearing piece before the motor solidifies; step 4, placing a rubber cushion on the metal bearing piece, placing the lid plate prefabricated in the step 1 in the lid plate groove chiseled in the step 2, and contacting the surface of the rubber cushion with the bottom surface of the lid plate; step 5, filling an interval between the lid plate and a pavement panel with a material layer. According to the construction method of the tunnel center inspection well lid adaptive to the heavy traffic rolling, the lid plate is underlaid with groove steel, and therefore bearing capability of the lid plate is improved, and the rubber cushion is mounted below the lid plate, and therefore the lid plate is adaptive to vehicle dynamic load. The construction method of the tunnel center inspection well lid adaptive to the heavy traffic rolling buries the metal bearing piece under the circumstance that a mortar levelling layer does not solidify, enables the mortar levelling layer to fully wrap the metal bearing piece, and enables the mortar levelling layer and the metal bearing piece to generate joint bearing capacity.
公开/授权文献:
- CN110158660B 一种适应于重交通碾压的隧道中心检查井井盖施工方法 公开/授权日:2021-03-09
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02D | 基础;挖方;填方;地下或水下结构物 |
------E02D29/00 | 地下或水下结构物;挡土墙 |
--------E02D29/12 | .人孔井;其他检查室或人可进入的室;其附属物 |
----------E02D29/14 | ..人孔或类似物的盖;盖的框架 |