基本信息:
- 专利标题: 一种含多种防雷措施的输电线路防雷项目评价方法和系统
- 专利标题(英):Method and system for evaluating lightning protection project of power transmission line containing various lightning protection measures
- 申请号:CN201910354784.0 申请日:2019-04-29
- 公开(公告)号:CN110097281A 公开(公告)日:2019-08-06
- 发明人: 谭凌峰 , 郑燕 , 王红晋 , 董祯 , 郭佳 , 康伟 , 周宏宇 , 刘昊 , 张恒
- 申请人: 国网经济技术研究院有限公司 , 国网河北省电力有限公司
- 申请人地址: 北京市昌平区未来科技城北区国家电网办公区B509
- 专利权人: 国网经济技术研究院有限公司,国网河北省电力有限公司
- 当前专利权人: 国网经济技术研究院有限公司,国网河北省电力有限公司
- 当前专利权人地址: 北京市昌平区未来科技城北区国家电网办公区B509
- 代理机构: 北京纪凯知识产权代理有限公司
- 代理人: 孙楠
- 主分类号: G06Q10/06
- IPC分类号: G06Q10/06 ; G06Q50/06 ; H02G13/00
The invention relates to a method and a system for evaluating a lightning protection project of a power transmission line containing various lightning protection measures. The method comprises the following steps: 1) calculating technical effect quantitative index values of different lightning protection projects by using an established technical effect quantitative evaluation index system according to various basic data and external meteorological condition normalization adjustment results of different statistical time sections before and after different lightning protection project treatmentmeasures are implemented on a collected target power transmission line; 2) scoring the technical effect quantitative index values of different lightning protection projects according to the technicaleffect quantitative index scoring standard and the technical effect quantitative index values obtained through calculation; 3) quantifying the index score condition through the technical effect of the lightning protection technical improvement project, and measuring the performance condition of each lightning protection technical improvement project in combination with the technical improvement target of the lightning protection technical improvement project; and 4) adjusting lightning protection treatment measures in each lightning protection technical improvement project according to the performance condition of each lightning protection technical improvement project. The method can be widely applied to the field of power grid operation safety assessment.