
基本信息:
- 专利标题: 一种典型地形铁塔组立施工装备
- 专利标题(英):Typical terrain iron tower assemblage construction equipment
- 申请号:CN201811541805.1 申请日:2018-12-17
- 公开(公告)号:CN109610922A 公开(公告)日:2019-04-12
- 发明人: 王晓刚 , 陈孝阳 , 王李君 , 陈治明 , 李雪红 , 王健 , 范龙华 , 罗修明 , 何洋 , 袁茂书 , 黄君蓉 , 次仁桑布 , 徐毅 , 苗峰显 , 宋洪磊 , 宋富勇
- 申请人: 国网西藏电力有限公司 , 四川蜀能电力有限公司
- 申请人地址: 西藏自治区拉萨市林廓北路19号
- 专利权人: 国网西藏电力有限公司,四川蜀能电力有限公司
- 当前专利权人: 国网西藏电力有限公司,四川蜀能电力有限公司
- 当前专利权人地址: 西藏自治区拉萨市林廓北路19号
- 代理机构: 北京天盾知识产权代理有限公司
- 代理人: 葛宏
- 主分类号: E04H12/00
- IPC分类号: E04H12/00 ; E04H12/34
The invention discloses typical terrain iron tower assemblage construction equipment. The typical terrain iron tower assemblage construction equipment comprises a main tower crane head section, a rotary four-way joint and a main tower crane standard section which are coaxially connected from top to bottom in sequence on an iron tower main body; lifting arms are arranged at the left end and the right end of the rotary four-way joint correspondingly, and lifting point ropes are arranged on lifting pieces; hoisting assemblies are arranged on the left side and the right side of the iron tower mainbody correspondingly; a roll-out support is arranged in the middle of the lower end of the iron tower main body; each hoisting assembly comprises an amplitude modulation storing and expanding device,an amplitude modulation steering pulley, a slip rope storing and expanding device and a slip rope steering pulley set which are sequentially fixed to the outer side of the lower end of the iron towermain body side by side, and further comprises an arm end pulley, an amplitude modulation trolley, two rod head steering pulley sets, two traction steering pulleys, two mechanically powered winches, an amplitude modulation rope, a traction rope, a guiding pulley set and two slip ropes; and an amplitude modulation rear pulley and an amplitude modulation front pulley are arranged at the two ends ofeach amplitude modulation trolley correspondingly, and a slip rope lifting lug is arranged below each amplitude modulation trolley. Butt-joint mounting of the lifting pieces can be quickly completed,and the safety guarantee and the construction efficiency can be effectively improved.
公开/授权文献:
- CN109610922B 一种典型地形铁塔组立施工装备 公开/授权日:2020-12-15
IPC结构图谱:
E | 固定建筑物 |
--E04 | 建筑物 |
----E04H | 专门用途的建筑物或类似的构筑物;游泳或喷水浴槽或池;桅杆;围栏;一般帐篷或天篷 |
------E04H12/00 | 塔;桅杆,柱;烟囱;水塔;架设这些结构的方法 |