![一种五线并行小间距浅埋大断面隧道群施工方法](/CN/2018/1/278/images/201811393945.jpg)
基本信息:
- 专利标题: 一种五线并行小间距浅埋大断面隧道群施工方法
- 专利标题(英):Five-line parallel small-spacing shallow buried large-section tunnel group construction method
- 申请号:CN201811393945.9 申请日:2018-11-21
- 公开(公告)号:CN109555527A 公开(公告)日:2019-04-02
- 发明人: 李晓军 , 李志军 , 王子茂 , 刘远鹏 , 蒋富强 , 孙建军 , 姜永东 , 汪雪雷 , 王亚昭 , 胡明华 , 李栋 , 张志勤 , 付德浩 , 蒋树峰
- 申请人: 中铁隧道集团二处有限公司 , 重庆大学
- 申请人地址: 河北省廊坊市三河市燕郊开发区学院路大街南侧
- 专利权人: 中铁隧道集团二处有限公司,重庆大学
- 当前专利权人: 中铁隧道集团二处有限公司,重庆大学
- 当前专利权人地址: 河北省廊坊市三河市燕郊开发区学院路大街南侧
- 代理机构: 北京同恒源知识产权代理有限公司
- 代理人: 赵荣之
- 主分类号: E21D9/00
- IPC分类号: E21D9/00 ; E21D9/14 ; E21D11/00
The invention relates to a five-line parallel small-spacing shallow buried large-section tunnel group construction method and belongs to the field of tunnel engineering. The five-line parallel small-spacing shallow buried large-section tunnel group construction method comprises the following steps that (1) tunnel excavation collapse and heading slope deformation are prevented through five tunnel portals, and measures of advanced large pipe sheds, advanced small guide pipes, advanced pre-grouting and the like are adopted; (2) five parallel tunnels B1 to B5 are synchronously constructed at the interval of a certain distance in the axis direction and synchronously propelled, a CD method is adopted for construction at the position with the good geological condition, and the method is adjustedto be a CRD method for construction at the position with the poor geological condition; and (3) anchor spraying and I-shaped steel frames are adopted for primary and secondary supporting of the tunnels, reinforced concrete structures are adopted as secondary linings, inverted arches are constructed firstly, and then side walls are constructed. According to the five-line parallel small-spacing shallow buried large-section tunnel group construction method, the problem of five-line parallel small-spacing shallow buried large-section tunnel group synchronous construction is solved, the risks of slope settlement and tunnel collapse are effectively reduced, and the safe, rapid and economical construction process is guaranteed.
公开/授权文献:
- CN109555527B 一种五线并行小间距浅埋大断面隧道群施工方法 公开/授权日:2020-06-30
IPC结构图谱:
E | 固定建筑物 |
--E21 | 土层或岩石的钻进;采矿 |
----E21D | 竖井;隧道;平硐;地下室 |
------E21D9/00 | 衬砌或不衬砌的隧道或平硐;其掘进的方法或设备;隧道、平硐的设计布置 |