基本信息:
- 专利标题: 一种TBM装置过竖井的施工实现方法及建筑装置
- 专利标题(英):Construction realization method and construction device for TBM device crossing shaft
- 申请号:CN201811456880.8 申请日:2018-11-30
- 公开(公告)号:CN109488318A 公开(公告)日:2019-03-19
- 发明人: 邓国栋 , 帅怀刚 , 姜立国 , 陈博 , 华伟雄
- 申请人: 中铁建南方建设投资有限公司
- 申请人地址: 广东省深圳市福田区京基滨河时代广场北区4906
- 专利权人: 中铁建南方建设投资有限公司
- 当前专利权人: 中铁建南方建设投资有限公司
- 当前专利权人地址: 广东省深圳市福田区京基滨河时代广场北区4906
- 代理机构: 深圳市君胜知识产权代理事务所
- 代理人: 王永文; 刘文求
- 主分类号: E21D9/06
- IPC分类号: E21D9/06 ; E21D5/04
The invention discloses a construction realization method and construction device for a TBM device crossing shaft, the construction realization method comprises the following steps: building concreteretaining walls at two sides of a TBM head after the TBM head enters the vertical shaft; pouring bean gravel and concrete slurry into the inner side of the concrete retaining walls; integrally backfilling bean gravel and concrete slurry after the TBM equipment is pushed in idle. According to the invention of the construction realization method and the construction device for TBM device crossing shaft, as the concrete retaining walls of buildings at two sides of the TBM head in the vertical shaft are adopted, the space at the bottom in the vertical shaft is isolated, bean gravel and concrete slurry are firstly poured into the inner side of the concrete retaining walls, therefore, the construction process in the vertical shaft is accelerated, and the whole filling can be carried out under the condition that the continuous construction of the TBM device is not influenced for the bean gravel and concrete slurry poured outside the retaining walls and in other spaces, so that the whole construction period is shortened, and the construction efficiency is higher.
公开/授权文献:
- CN109488318B 一种TBM装置过竖井的施工实现方法及建筑装置 公开/授权日:2020-07-24
IPC结构图谱:
E | 固定建筑物 |
--E21 | 土层或岩石的钻进;采矿 |
----E21D | 竖井;隧道;平硐;地下室 |
------E21D9/00 | 衬砌或不衬砌的隧道或平硐;其掘进的方法或设备;隧道、平硐的设计布置 |
--------E21D9/06 | .通过使用掘进护板 |