- 专利标题: 穿越高角度逆冲富水富砂断层隧道施工方法
- 申请号:CN201811414022.7 申请日:2018-11-26
- 公开(公告)号:CN109209397B 公开(公告)日:2019-09-10
- 发明人: 吴应明 , 张旭辉 , 高雷州 , 张乃乐 , 周中财 , 肖清华 , 仲维玲 , 郭朋超 , 王洪坤 , 赵志辉 , 李校珂 , 杨文 , 杨荣辉 , 李越兴 , 陈创 , 洪平
- 申请人: 中铁二十局集团有限公司
- 申请人地址: 陕西省西安市未央区太华路89号
- 专利权人: 中铁二十局集团有限公司
- 当前专利权人: 中铁二十局集团有限公司
- 当前专利权人地址: 陕西省西安市未央区太华路89号
- 代理机构: 西安创知专利事务所
- 代理人: 谭文琰
- 主分类号: E21D9/00
- IPC分类号: E21D9/00 ; E21F16/02 ; E21D11/10 ; E21D11/18 ; E21D11/14
The invention discloses a construction method for a tunnel passing through a high-angle thrust water-rich and sand-rich fault. The method comprises the steps: 1, performing the preliminary excavationand the supporting construction of a rear tunnel segment; 2, performing the synchronous excavation and the supporting construction of the rear tunnel segment and a water drainage hole body of a waterdrainage hole; 3, performing the synchronous excavation and the supporting construction of the rear tunnel segment, the water drainage hole body of the water drainage hole and a rear detouring headingsegment; 4, performing the excavation and the supporting construction of a front water drainage hole body, a front heating segment and a central tunnel segment; 5, performing the excavation and the supporting construction of a front tunnel segment. According to the invention, the water on the upper wall of the fault is drained through a high-level water drainage hole between a tunnel front hole and a detouring heading pit, and the auxiliary water drainage is performed through the detouring heading pit, and the fault condition in front of the tunnel face of the front hole can be explored in advance, thereby guaranteeing the construction safety of each tunnel face. The method employs the three-step method for the excavation of the tunnel front hole, employs double preliminary supporting structures for the full-section supporting after excavation, can guarantee the safety of the tunnel structure later, and shortens the construction cycle.
公开/授权文献:
- CN109209397A 穿越高角度逆冲富水富砂断层隧道施工方法 公开/授权日:2019-01-15