基本信息:
- 专利标题: 一种基于移动互联电力物资抽检双数据的比对方法
- 专利标题(英):A method for comparing dual data of sampling inspection of electric material based on mobile interconnection
- 申请号:CN201810752502.8 申请日:2018-07-10
- 公开(公告)号:CN109034564A 公开(公告)日:2018-12-18
- 发明人: 林剑 , 谢资明 , 李勇 , 谢黇 , 郭姿萍 , 官文辉 , 程凯 , 郑海彬 , 徐雅雯 , 陈楠
- 申请人: 国网福建省电力有限公司 , 国网福建省电力有限公司南平供电公司 , 上海洲固电力科技有限公司
- 申请人地址: 福建省福州市鼓楼区五四路257号; ;
- 专利权人: 国网福建省电力有限公司,国网福建省电力有限公司南平供电公司,上海洲固电力科技有限公司
- 当前专利权人: 国网福建省电力有限公司,国网福建省电力有限公司南平供电公司,上海洲固电力科技有限公司
- 当前专利权人地址: 福建省福州市鼓楼区五四路257号; ;
- 代理机构: 福州元创专利商标代理有限公司
- 代理人: 蔡学俊
- 主分类号: G06Q10/06
- IPC分类号: G06Q10/06 ; G06Q50/06
The invention relates to a method for comparing dual data of sampling inspection of electric material based on mobile interconnection. The method comprises the following steps: step S1: a new materialsupply plan is introduced into a material sampling inspection platform. The platform generates a sampling inspection plan according to a sampling inspection strategy through an automatic adjustment algorithm of the detection plan. Step S2: the automatic adjustment algorithm of the detection plan takes the new material purchase order number and the purchase order line number as the unique mark code of the record; 3, analyze and obtaining that predict arrival time of the new material according to the predicting algorithm of the arrival time of the supplier material; Step S4: the automatic adjustment algorithm of the detection plan confirms whether the delivery date is changed according to the unique mark code, and if the delivery date is changed, the step S5 is carried out, otherwise, the detection of the plan is ended; Step S5: The automatic adjustment algorithm of the inspection plan finds out whether the sampling inspection record already exists from the sampling inspection plan, andif so, adjusts the sampling inspection plan according to the determined delivery time and the arrival probability of materials of the supplier. The invention improves the accuracy of the algorithm for generating the detection plan by calculating the arrival time of the material, and reduces the adjustment frequency of the detection plan.