- 专利标题: 一种整体道床钢筋原位架空安装辅助支架的方法
- 专利标题(英):Method of using auxiliary support to mount integrated ballast bed reinforcement in situ in an overhead manner
- 申请号:CN201811147111.X 申请日:2018-09-29
- 公开(公告)号:CN108914717A 公开(公告)日:2018-11-30
- 发明人: 邹波 , 王金海 , 黄伟强 , 罗永明 , 王俊河 , 马婷婷 , 黄华琴 , 杨剑 , 谭志勇 , 刘林林 , 杨智丞 , 刘长贤 , 徐海凑 , 侯飞 , 郑子腾
- 申请人: 中铁城建集团第二工程有限公司 , 中铁城建集团有限公司
- 申请人地址: 广东省广州市越秀区共和西路8号5-7层
- 专利权人: 中铁城建集团第二工程有限公司,中铁城建集团有限公司
- 当前专利权人: 中铁城建集团第二工程有限公司,中铁城建集团有限公司
- 当前专利权人地址: 广东省广州市越秀区共和西路8号5-7层
- 代理机构: 广州三环专利商标代理有限公司
- 代理人: 王会龙
- 主分类号: E01B1/00
- IPC分类号: E01B1/00 ; E01B3/28 ; E04C5/16
The invention discloses a method of using an auxiliary support to mount an integrated ballast bed reinforcement in situ in an overhead manner. The method of using the auxiliary support to mount the integrated ballast bed reinforcement in situ in an overhead manner comprises the steps of making tripods of two expansion joints and matched members; fixing top channel steel and inserting galvanized steel pipes into the tripods; placing longitudinal reinforcements, sleeving a hoop and binding the longitudinal reinforcements as required; inserting side reinforcements and bottom longitudinal reinforcements into the hoop and binding the side reinforcements and the bottom longitudinal reinforcements as required; pulling manual hoists at a constant speed to integrally lift the reinforcements; and putting the whole integrated ballast bed reinforcement into a foundation groove. According to the method of using the auxiliary support to mount the integrated ballast bed reinforcement in situ in an overhead manner, as the operation surface of the track foundation reinforcement project is transferred from the interior of a track foundation pit to a position right above the foundation pit by using members such as the special tripods, the galvanized steel pipes, the reinforcements, the channel steel and hooked reinforcements, the distances between the reinforcements can be preferably controlled,the binding of the reinforcements are more convenient and faster, the quality of the track reinforcement project is integrally improved, the integrated ballast bed reinforcement binding working spaceis increased, the construction period is reduced, the labor is saved, and the the construction of the integrated ballast bed reinforcement project can be rapidly finished.
公开/授权文献:
- CN108914717B 一种整体道床钢筋原位架空安装辅助支架的方法 公开/授权日:2019-12-27