- 专利标题: 一种钢管柱一体化施工调垂方法
- 专利标题(英):Steel pipe column integrated construction verticality adjusting method
- 申请号:CN201810752752.1 申请日:2018-07-10
- 公开(公告)号:CN108798042A 公开(公告)日:2018-11-13
- 发明人: 许志忠 , 崔磊 , 马建民 , 张洪军 , 周翠红 , 冯利华 , 刘建华 , 李金涛 , 任全军 , 熊巍 , 许君珍 , 左桂超 , 陈佳蕊
- 申请人: 中铁一局集团第二工程有限公司
- 申请人地址: 河北省唐山市唐山路南区国防道49号
- 专利权人: 中铁一局集团第二工程有限公司
- 当前专利权人: 中铁一局集团第二工程有限公司
- 当前专利权人地址: 河北省唐山市唐山路南区国防道49号
- 代理机构: 北京凯特来知识产权代理有限公司
- 代理人: 郑立明; 赵镇勇
- 主分类号: E04G21/18
- IPC分类号: E04G21/18
The invention discloses a steel pipe column integrated construction verticality adjusting method. The center point of a steel pipe column is placed at a vault of a small pilot drift by a total station, and pile longitudinal axes are put on the side walls of both sides of the pilot drift; before installing the steel pipe column, a positioning cross wire is installed at a lower opening of the bottommost section of the steel pipe column, and a high-strength PE wire is tied at the center point; after the steel pipe column is installed, the high-strength PE wire is led from the interior of the steel pipe column to the center point of the pile position of the vault, the wire is straightened, and it is ensured that the two points are in a straight line; then a positioning cross wire is installedat a flange of an upper opening of the top section of the steel pipe column, then the longitudinal axis on which the pile position is located is pulled, and the center point of the pile position on the longitudinal axis is positioned with the total station; and finally, the position of the steel pipe column is adjusted by a chuck to enable the four points of the center of the column bottom, the center of the column top, the center of the longitudinal axes and the column center of the vault to be in a straight line, so that the verticality of the steel pipe column can be ensured and the accurate construction location of the steel pipe column can be ensured. The steel pipe column integrated construction verticality adjusting method eliminates multiple traditional processes such as pumping and draining pile hole mud, steel casing and manual positioner installation down the hole, thereby improving construction safety; and construction cost is reduced, and construction efficiency is improved.
公开/授权文献:
- CN108798042B 一种钢管柱一体化施工调垂方法 公开/授权日:2020-09-01
IPC结构图谱:
E | 固定建筑物 |
--E04 | 建筑物 |
----E04G | 脚手架、模壳;模板;施工用具或其他建筑辅助设备,或其应用;建筑材料的现场处理;原有建筑物的修理,拆除或其他工作 |
------E04G21/00 | 建筑材料或建筑构件在现场的制备,搬运或加工;施工中采用的其他方法和设备 |
--------E04G21/14 | .建筑构件的运输或装配 |
----------E04G21/16 | ..工具或设备 |
------------E04G21/18 | ...调整工具;样板 |