- 专利标题: 大断面马蹄形盾构路堑接收施工方法
- 申请号:CN201810446467.7 申请日:2018-05-11
- 公开(公告)号:CN108691552B 公开(公告)日:2019-11-26
- 发明人: 申志军 , 王江红 , 杨世武 , 王士明 , 仇文革 , 毕清泉 , 夏勇 , 谢飞 , 郑余朝
- 申请人: 中铁四局集团有限公司 , 蒙西华中铁路股份有限公司 , 西南交通大学
- 申请人地址: 安徽省合肥市包河区望江东路96号
- 专利权人: 中铁四局集团有限公司,蒙西华中铁路股份有限公司,西南交通大学
- 当前专利权人: 中铁四局集团有限公司,蒙西华中铁路股份有限公司西南交通大学
- 当前专利权人地址: 安徽省合肥市包河区望江东路96号
- 代理机构: 重庆上义众和专利代理事务所
- 代理人: 谭勇
- 主分类号: E21D9/087
- IPC分类号: E21D9/087 ; E21D9/06 ; E21D9/12 ; E21D11/10 ; E21D11/18
A large section U-shaped shield cutting receiving construction method comprises the following steps: step 1: V-shaped retaining wall support edge front slops are constructed on the two sides of a caveopening ring; step 2: the time for starting removing a cave gate is determined according to the shield excavation condition and the receiving process requirement, and the cave door is prepared to beremoved; step 3: the cave door is removed, firstly a steel scaffold is erected in the range of a cave door steel ring on a receiving base, rooting is performed in the receiving base, and receiving retaining walls on two sides are erected into a whole; the lower part of the scaffold is padded, the two sides of the scaffold are connected and fastened with the retaining walls respectively, and boardsare laid on cross arms and fixed with the cross arms; according to the cutting receiving technology, the strengthening and support measures of common cave opening rotary spraying, piles and the likein metro construction are replaced with the V-shaped retaining wall support edge front slops, and at the same time, the lifting requirement and the connection measure of cave opening edge front slopswith an open cut tunnel are considered. The problems of the cutting edge front slop stability and the open cut channel structure connection are solved.
公开/授权文献:
- CN108691552A 大断面马蹄形盾构路堑接收施工方法 公开/授权日:2018-10-23
IPC结构图谱:
E | 固定建筑物 |
--E21 | 土层或岩石的钻进;采矿 |
----E21D | 竖井;隧道;平硐;地下室 |
------E21D9/00 | 衬砌或不衬砌的隧道或平硐;其掘进的方法或设备;隧道、平硐的设计布置 |
--------E21D9/06 | .通过使用掘进护板 |
----------E21D9/08 | ..附带钻进或截割工具的 |
------------E21D9/087 | ...利用一个旋转钻头同时截割整个断面,即全断面设备 |