- 专利标题: 高水头地质条件下的套管咬合桩的施工方法
- 专利标题(英):Construction method for casing pipe occlusive pile in high-water-head geological condition
- 申请号:CN201810218282.0 申请日:2018-03-16
- 公开(公告)号:CN108487232A 公开(公告)日:2018-09-04
- 发明人: 张晓亮 , 张玉民 , 赵香萍 , 曹立波 , 董豪
- 申请人: 中铁十二局集团第二工程有限公司 , 中铁十二局集团有限公司
- 申请人地址: 山西省太原市小店区人民南路19号
- 专利权人: 中铁十二局集团第二工程有限公司,中铁十二局集团有限公司
- 当前专利权人: 中铁十二局集团第二工程有限公司,中铁十二局集团有限公司
- 当前专利权人地址: 山西省太原市小店区人民南路19号
- 代理机构: 北京润平知识产权代理有限公司
- 代理人: 邝圆晖; 蒋爱花
- 主分类号: E02D5/18
- IPC分类号: E02D5/18 ; E02D5/34 ; E02D19/18
The invention discloses a construction method for a casing pipe occlusive pile in a high-water-head geological condition. The construction method comprises the steps that a plurality of piling hole positions are obtained, the multiple piling hole positions comprise a plurality of unreinforced hole positions, a plurality of reinforced hole positions and a sand pile hole position; the multiple unreinforced hole positions and the multiple reinforced hole positions are numbered in sequence correspondingly; the first unreinforced hole position with the foremost numbering sequence is subjected to pouring operation, and whether the first unreinforced hole position meets the preset state or not is judged after pouring is completed; and the piling hole positions which are not subjected to pouring are subjected to pouring operation based on the judgment result. After pouring of the first unreinforced hole position is completed, the subsequent pouring sequences are adjusted according to the pouring state of the first unreinforced hole position, it is guaranteed that the unreinforced hole positions cannot be influenced in the pouring process of each reinforced hole position, accidents such aspiping and casing pipe water inrush are effectively avoided, normal construction in the high-water-head geological condition is guaranteed, construction safety and quality are improved, and construction efficiency is improved.
公开/授权文献:
- CN108487232B 高水头地质条件下的套管咬合桩的施工方法 公开/授权日:2020-07-14
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02D | 基础;挖方;填方;地下或水下结构物 |
------E02D5/00 | 基础工程专用的板桩墙,桩或其他结构构件 |
--------E02D5/18 | .在现场只用混凝土做的护壁或类似墙壁 |