- 专利标题: 一种现浇道床板式无砟轨道道床板整体更换方法
- 专利标题(英):Cast-in-place ballast bed slab type ballastless track ballast bed slab integral replacement method
- 申请号:CN201810188312.8 申请日:2018-03-07
- 公开(公告)号:CN108385456A 公开(公告)日:2018-08-10
- 发明人: 郑新国 , 刘竞 , 谢永江 , 潘永健 , 张杰 , 何元庆 , 黄传岳 , 王永华 , 刘文 , 陈江 , 温希华 , 李书明 , 郭超 , 曾志 , 管曙刚 , 程冠之 , 董全霄 , 范红卫 , 刘相会 , 杨德军 , 周骏 , 郁培云 , 朱长华 , 冯仲伟 , 秦菊 , 王伟唯 , 谢清清 , 王月华 , 饶云兵
- 申请人: 中国铁道科学研究院铁道建筑研究所 , 北京铁科特种工程技术开发公司 , 中国铁道科学研究院 , 中国铁路总公司
- 申请人地址: 北京市海淀区大柳树路2号
- 专利权人: 中国铁道科学研究院铁道建筑研究所,北京铁科特种工程技术开发公司,中国铁道科学研究院,中国铁路总公司
- 当前专利权人: 中国铁道科学研究院集团有限公司铁道建筑研究所,北京铁科特种工程技术有限公司中国铁道科学研究院集团有限公司中国铁路总公司
- 当前专利权人地址: 北京市海淀区大柳树路2号
- 主分类号: E01B29/00
- IPC分类号: E01B29/00
The invention relates to a cast-in-place ballast bed slab type ballastless track ballast bed slab integral replacement method and belongs to the technical field of high-speed railway ballastless trackstructure maintenance and repair. The method includes the basic procedure that after a ballast bed slab needing to be integrally replaced is determined, ribs are embedded in non-replaced ballast bedslabs at the two ends of the to-be-replaced ballast bed slab in a certain range, transverse line run-through cutting is conducted on the two ends of the to-be-replaced ballast bed slab, a new ballastbed slab integrally prefabricated offline in advance and provided with reserved connecting ribs is used for integrally replacing the existing ballast bed slab under a transverse track shifting condition, and finally, track structure longitudinal connection and integrity are recovered. Under the condition that steel rails are not cut off, diseases of the ballast bed slab, sleepers and the interfaces of the ballast bed slab and the sleepers of a cast-in-place ballast bed slab type ballastless track are quickly eradicated in an offline prefabrication and online integral replacement mode, the quality is guaranteed, meanwhile, the method can be suitable for various ballast bed slab forms, and the integral replacement requirement of the ballast bed slab of a single line, a large longitudinal slope and a large ultrahigh section under a special working condition can be met.