![绝缘拉杆浇注模具及其封盖](/CN/2017/1/297/images/201711488129.jpg)
基本信息:
- 专利标题: 绝缘拉杆浇注模具及其封盖
- 申请号:CN201711488129.1 申请日:2017-12-29
- 公开(公告)号:CN108340522B 公开(公告)日:2020-05-26
- 发明人: 吴明清 , 杨保利 , 王晶 , 汤成祥 , 张佩 , 高威昊 , 侯亚峰 , 陈蕊
- 申请人: 平高集团有限公司 , 河南平高电气股份有限公司 , 国家电网有限公司 , 国网浙江省电力有限公司
- 申请人地址: 河南省平顶山市南环东路22号
- 专利权人: 平高集团有限公司,河南平高电气股份有限公司,国家电网有限公司,国网浙江省电力有限公司
- 当前专利权人: 平高集团有限公司,河南平高电气股份有限公司,国家电网有限公司,国网浙江省电力有限公司
- 当前专利权人地址: 河南省平顶山市南环东路22号
- 代理机构: 郑州睿信知识产权代理有限公司
- 代理人: 胡晓东
- 主分类号: B29C39/26
- IPC分类号: B29C39/26 ; B29L31/34 ; B29K63/00
The invention relates to an insulating pull rod pouring mould and a sealing cover thereof. The insulating pull rod pouring mould comprises an outer mould and a core shaft arranged in the outer mould.A mould cavity used for forming of an insulating pull rod is defined by the outer mould and the core shaft. The end of the outer mould is provided with the sealing cover used for being fixedly assembled with the outer mould. The side, facing the mould cavity, of the sealing cover is provided with a positioning hole used for positioning the end of the core shaft. The hole wall of the positioning hole is provided with a material storage groove used for conducting material supplementing on the mould cavity in the curing process. By forming the material storage groove in the sealing cover, materials put in the material storage groove can be supplemented to a shrinkage part in the curing process, the problem that the size of the insulating pull rod does not meet the requirement due to materialshrinkage in the curing process of the insulating pull rod material is solved, the curing using amount is ensured, and the problem of secondary material adding is avoided; and meanwhile, a space is provided for gas escaping from the materials through the material storage groove after material supplementing is conducted, and the situation that the gas is accumulated in the materials to form defectsis avoided.
公开/授权文献:
- CN108340522A 绝缘拉杆浇注模具及其封盖 公开/授权日:2018-07-31
IPC结构图谱:
B | 作业;运输 |
--B29 | 塑料的加工;一般处于塑性状态物质的加工 |
----B29C | 塑料的成型或连接;塑性状态物质的一般成型;已成型产品的后处理,如修整 |
------B29C39/00 | 浇注成型,即将模制材料引入模型或没有显著模制压力的两个封闭表面之间;所用的设备 |
--------B29C39/02 | .用于制造定长的制品,即不连续的制品 |
----------B29C39/26 | ..模型或型芯 |