![一种沿海码头受撞损伤桥墩不卸载工况下修复加强方法](/CN/2017/1/276/images/201711384763.jpg)
基本信息:
- 专利标题: 一种沿海码头受撞损伤桥墩不卸载工况下修复加强方法
- 专利标题(英):Method for repairing and strengthening bridge pier damaged by collision under no-unloading condition on coastal wharf
- 申请号:CN201711384763.0 申请日:2017-12-20
- 公开(公告)号:CN108265635A 公开(公告)日:2018-07-10
- 发明人: 周文 , 冯朝军 , 郭磊 , 缪晨辉 , 王保 , 吕文熙
- 申请人: 中铁广州工程局集团有限公司 , 中铁广州工程局集团桥梁工程有限公司
- 申请人地址: 广东省广州市南沙区进港大道582号
- 专利权人: 中铁广州工程局集团有限公司,中铁广州工程局集团桥梁工程有限公司
- 当前专利权人: 中铁广州工程局集团有限公司,中铁广州工程局集团桥梁工程有限公司
- 当前专利权人地址: 广东省广州市南沙区进港大道582号
- 代理机构: 广州嘉权专利商标事务所有限公司
- 代理人: 谭英强; 黄国亮
- 主分类号: E01D22/00
- IPC分类号: E01D22/00 ; E01D19/02
The invention discloses a method for repairing and strengthening a bridge pier damaged by collision under a no-unloading condition on a coastal wharf. The method comprises the steps that loose concrete on a damaged pile is firstly cleaned away, and water accumulated inside the damaged pile is extracted; concrete is poured into the hollow part of the damaged pile for repairing and strengthening, and the outer side of the damaged pile is sleeved with a steel sleeve; fine stone concrete is poured between the steel sleeve and the damaged pile, and a working platform is installed by using the steelsleeve; two ends of the working platform support jacks to reversely jack a cross cover beam, and a micro-expansive grouting material is poured into the gap section between the top surface of a length-jointing pile of the steel sleeve and the bottom of the cross cover beam; and a steel pipe pile is added near the damaged pile, the cross cover beam is lengthened, and the cross cover beam is connected with the steel pipe pile. The cross cover beam is reversely jacked with a jack device to reduce cumulative stress of an upper structure caused by damage, the structural safety stock is not reduced,and the initial stress state of the structural design is restored; and in the process of repairing the damaged pile, the hollow part of the damaged pile is filled with the concrete for reinforcement,the damaged pile is sleeved with the steel sleeve, and the hollow part of the damaged pile is filled with the concrete for strengthening a pile foundation.
公开/授权文献:
- CN108265635B 一种沿海码头受撞损伤桥墩不卸载工况下修复加强方法 公开/授权日:2019-04-23
IPC结构图谱:
E | 固定建筑物 |
--E01 | 道路、铁路或桥梁的建筑 |
----E01D | 桥梁 |
------E01D22/00 | 维修或加固现有桥梁的方法或设备E01D24/00拆桥的方法或设备涉及桥梁结构的材料,与E01D1/00至E01D22/00组联合使用 |