
基本信息:
- 专利标题: 一种消除循环流化床锅炉床温偏差的方法
- 专利标题(英):Method for eliminating temperature deviation of circulating fluidized bed boiler
- 申请号:CN201810073601.3 申请日:2018-01-25
- 公开(公告)号:CN108253415A 公开(公告)日:2018-07-06
- 发明人: 雷宏彬 , 段瑞斌 , 贠小龙 , 刘海洋 , 刘涛 , 胡红军 , 胡寻健 , 苏春岩 , 高飞 , 师琰杰 , 陈波 , 李杨 , 刘彦军
- 申请人: 黄陵矿业煤矸石发电有限公司
- 申请人地址: 陕西省延安市黄陵县店头镇
- 专利权人: 黄陵矿业煤矸石发电有限公司
- 当前专利权人: 黄陵矿业煤矸石发电有限公司
- 当前专利权人地址: 陕西省延安市黄陵县店头镇
- 代理机构: 西安创知专利事务所
- 代理人: 谭文琰
- 主分类号: F23C10/28
- IPC分类号: F23C10/28
The invention discloses a method for eliminating temperature deviation of a circulating fluidized bed boiler. The method comprises the steps that 1, temperature measuring points are distributed, and temperature sensors are installed; 2, the number and diameter of round steel to be additionally installed in a hood are calculated; 3, the round steel is additionally installed in the hood; and 4, theround steel additionally installed in the hood is adjusted, and the largest bed temperature deviation is output. The method is simple in steps and convenient to implement, the problem that the temperature of the circulating fluidized bed boiler is large in middle and small in two ends is solved by additionally installing the round steel to the corresponding area of the hood and changing the largest bed temperature deviation, NOX original production caused by local high temperature is reduced, the overall fluidizing effect of materials is improved, and practicability is high.
公开/授权文献:
- CN108253415B 一种消除循环流化床锅炉床温偏差的方法 公开/授权日:2019-06-14
IPC结构图谱:
F | 机械工程;照明;加热;武器;爆破 |
--F23 | 燃烧设备;燃烧方法 |
----F23C | 使用流体燃料的燃烧方法或设备 |
------F23C10/00 | 燃烧发生在燃料或其他颗粒的流化床内的设备 |
--------F23C10/18 | .零部件;辅助设备 |
----------F23C10/28 | ..专门适用于流化床燃烧设备的控制装置 |