- 专利标题: 拆除深基坑无支撑围护体系中有压混凝土梁的方法
- 专利标题(英):Method for dismantling compressed concrete beams in deep-foundation-pit unsupported enclosure system
- 申请号:CN201611175660.9 申请日:2016-12-19
- 公开(公告)号:CN108203980A 公开(公告)日:2018-06-26
- 发明人: 王建营 , 杨煜 , 吉明军 , 芮兴龙 , 强鹏 , 张林 , 杨春生 , 王英 , 曹少卫 , 王沧州 , 李静 , 杨宝龙 , 田华 , 胡士一 , 丁少龙 , 勇跃山 , 郝岭 , 吴廷勇 , 王会言 , 袁果 , 魏礼军 , 杨发尧 , 冷晓威 , 赵晓娜 , 尹韶哲 , 王玉霞
- 申请人: 中铁建工集团有限公司
- 申请人地址: 上海市普陀区交通路4621弄李子园商务区10号楼16层
- 专利权人: 中铁建工集团有限公司
- 当前专利权人: 中铁建工集团有限公司
- 当前专利权人地址: 上海市普陀区交通路4621弄李子园商务区10号楼16层
- 代理机构: 上海京沪专利代理事务所
- 代理人: 周志宏
- 主分类号: E02D17/04
- IPC分类号: E02D17/04
The invention relates to a method for dismantling compressed concrete beams in a deep-foundation-pit unsupported enclosure system. The method is characterized by comprising the following steps that (1) according to the section of one compressed concrete beam in the deep-foundation-pit unsupported enclosure system, a counter-force support is manufactured; (2) the counter-force support is fixed to the compressed concrete beam through a horizontal shear resistance bolt; (3) the other pairs of counter-force supports are mounted a certain distance away from the position where the counter-force support is mounted by repeatedly carrying out the step (2); (4) horizontally-arranged jacks with the equal number are arranged between every two counter-force supports; (5) jacking force is applied to thejacks, the jacking force value is matched with the pressure borne by the compressed concrete beam, at the moment, a pressureless beam is formed, cutting is implemented on the pressureless beam, and the cutting face is parallel to the beam section; (6) after cutting, force unloading is conducted on the jacks step by step according to the regulation and time till stress of the jacks is zero; and (7) the other compressed concrete beams in the deep-foundation-pit unsupported enclosure system are dismantled continuously according to the steps. According to the method, 'zero' damage is caused to amajor structure, the directengineering cost is greatly reduced, the construction period is shortened by 2/3, and the benefit in the construction period is huge.
公开/授权文献:
- CN108203980B 拆除深基坑无支撑围护体系中有压混凝土梁的方法 公开/授权日:2023-06-09
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02D | 基础;挖方;填方;地下或水下结构物 |
------E02D17/00 | 挖方;挖方边缘的修砌;填方 |
--------E02D17/02 | .基础坑 |
----------E02D17/04 | ..基础坑边缘的修砌或加固 |