![一种考虑火电电蓄热联合调峰的日前发电计划优化方法](/CN/2017/1/286/images/201711432323.jpg)
基本信息:
- 专利标题: 一种考虑火电电蓄热联合调峰的日前发电计划优化方法
- 专利标题(英):Day-ahead generation schedule optimization method considering thermal power and electric thermal storage combined peaking
- 申请号:CN201711432323.8 申请日:2017-12-26
- 公开(公告)号:CN108123492A 公开(公告)日:2018-06-05
- 发明人: 葛维春 , 张彦涛 , 刘刚 , 王顺江 , 刘淼 , 李正文 , 赵适宜 , 郭春雨 , 薛丽敏 , 王洪哲 , 句荣滨 , 寿增 , 施毅斌 , 赵军 , 涂孟夫 , 丁恰 , 昌力 , 张小白 , 张淳 , 李家珏 , 罗桓桓
- 申请人: 国网辽宁省电力有限公司 , 国电南瑞科技股份有限公司 , 国电南瑞南京控制系统有限公司 , 国网辽宁省电力有限公司电力科学研究院 , 国家电网公司
- 申请人地址: 辽宁省沈阳市和平区宁波路18号
- 专利权人: 国网辽宁省电力有限公司,国电南瑞科技股份有限公司,国电南瑞南京控制系统有限公司,国网辽宁省电力有限公司电力科学研究院,国家电网公司
- 当前专利权人: 国网辽宁省电力有限公司,国电南瑞科技股份有限公司,国电南瑞南京控制系统有限公司,国网辽宁省电力有限公司电力科学研究院,国家电网公司
- 当前专利权人地址: 辽宁省沈阳市和平区宁波路18号
- 主分类号: H02J3/46
- IPC分类号: H02J3/46
The invention belongs to the technical field of dispatching automation of an electric power system, and relates to a day-ahead generation schedule optimization method considering thermal power and electric thermal storage combined peaking. Based on day-ahead generation schedule planning input data, on the basis of a conventional optimization model, relevant parameters of thermal power generating unit deep peaking and electric thermal storage energy storage peaking are maintained, relevant constraint conditions of thermal power generating unit deep peaking and electric thermal storage energy storage peaking are introduced, and a day-ahead generation schedule optimization model, namely an SCED model, considering thermal power and electric thermal storage combined peaking is formed; through the optimization model, the future operation condition of a power grid can be combined, a more reliable and effective thermal power and electric thermal storage energy storage active plan is programmedunder the condition that system new energy consumption capacity and system load peaking requirement are sufficiently evaluated, the unit planning implementation rate is improved, the system peaking pressure is alleviated, the maximum consumption of new energy is realized, and the increasingly refined large power grid safety operation requirement is met.
公开/授权文献:
- CN108123492B 一种考虑火电电蓄热联合调峰的日前发电计划优化方法 公开/授权日:2019-11-22
IPC结构图谱:
H | 电学 |
--H02 | 发电、变电或配电 |
----H02J | 供电或配电的电路装置或系统;电能存储系统 |
------H02J3/00 | 交流干线或交流配电网络的电路装置 |
--------H02J3/38 | .由两个或两个以上发电机、变换器或变压器对1个网络并联馈电的装置 |
----------H02J3/46 | ..发电机、变换器或变压器之间输出分配的控制 |