基本信息:
- 专利标题: 隧道中隔墙结构及利用中隔墙法实现隧道分步开挖的方法
- 专利标题(英):Tunnel middle partition wall structure and method for staged excavation of tunnel by means of middle partition wall method
- 申请号:CN201711171887.0 申请日:2017-11-22
- 公开(公告)号:CN107725064A 公开(公告)日:2018-02-23
- 发明人: 孔恒 , 吴进科 , 谭忠盛 , 杜文涛 , 孙强 , 张鹏 , 周阳 , 文言 , 靳利军 , 马少军 , 高飞 , 高明生 , 程立华 , 汪凉 , 吴江 , 张全贺 , 黄振龙 , 刘羽 , 王雄 , 付贵庆 , 高万夫 , 王鹏 , 陈斌 , 陈伟 , 汤明 , 崔宇声 , 王彬 , 张冰
- 申请人: 北京市政建设集团有限责任公司 , 北京市市政一建设工程有限责任公司
- 申请人地址: 北京市海淀区昌运宫17号市政大厦
- 专利权人: 北京市政建设集团有限责任公司,北京市市政一建设工程有限责任公司
- 当前专利权人: 北京市政建设集团有限责任公司,北京市市政一建设工程有限责任公司
- 当前专利权人地址: 北京市海淀区昌运宫17号市政大厦
- 代理机构: 北京律谱知识产权代理事务所
- 代理人: 罗建书
- 主分类号: E21D11/00
- IPC分类号: E21D11/00 ; E21D11/10
The invention relates to a tunnel middle partition wall structure and a method for staged excavation of a tunnel by means of a middle partition wall method. One side of a tunnel primary support (4) isattached and fixed to a tunnel surrounding rock, and secondary lining is attached to the other side of the tunnel primary support (4); a first erect middle partition wall (1) and a second erect middle partition wall (2) are vertically arranged in the tunnel in parallel, and both the upper ends and the lower ends of the first erect middle partition wall (1) and the second erect middle partition wall (2) are connected with the tunnel primary support (4) separately; a cross partition wall (3) crosses with the first erect middle partition wall (1) and the second erect middle partition wall (2) and is transversely arranged in the tunnel, and both the left end and the right end of the cross partition wall (3) are connected with the tunnel primary support (4). Compared with a traditional middlepartition wall method, stress on the middle partition wall is rational, instable failure of the whole is unlikely to occur, and connection failure does not occur; a sufficient support effect on a vault can be achieved, so that vault settlement is effectively controlled. Moreover, the whole construction process of the middle partition wall is simplified, lots of manpower, material resources and time are saved, the construction progress is accelerated, and the total construction cost is reduced.
IPC结构图谱:
E | 固定建筑物 |
--E21 | 土层或岩石的钻进;采矿 |
----E21D | 竖井;隧道;平硐;地下室 |
------E21D11/00 | 隧道、平硐或其他地下洞室,例如,地下大型硐室的衬砌;其衬砌物;现场制衬砌物,例如,通过组装 |