![一种自动调度系统中小电流接地快速试拉方法及系统](/CN/2017/1/128/images/201710640442.jpg)
基本信息:
- 专利标题: 一种自动调度系统中小电流接地快速试拉方法及系统
- 专利标题(英):Low-current grounding rapid test pull method in automatic scheduling system and system thereof
- 申请号:CN201710640442.6 申请日:2017-07-31
- 公开(公告)号:CN107329035A 公开(公告)日:2017-11-07
- 发明人: 孙世明 , 刘翌 , 郭建成 , 孟勇亮 , 蒋宇 , 韩肖 , 罗俊 , 盛振明 , 马洁 , 杨雪 , 沈鑫
- 申请人: 国电南瑞科技股份有限公司 , 国家电网公司 , 国网江苏省电力公司 , 国网江苏省电力公司连云港供电公司 , 国电南瑞南京控制系统有限公司 , 南京南瑞集团公司
- 申请人地址: 江苏省南京市高新区高新路20号
- 专利权人: 国电南瑞科技股份有限公司,国家电网公司,国网江苏省电力公司,国网江苏省电力公司连云港供电公司,国电南瑞南京控制系统有限公司,南京南瑞集团公司
- 当前专利权人: 国电南瑞科技股份有限公司,国家电网公司,国网江苏省电力公司,国网江苏省电力公司连云港供电公司,国电南瑞南京控制系统有限公司,南京南瑞集团公司
- 当前专利权人地址: 江苏省南京市高新区高新路20号
- 代理机构: 南京纵横知识产权代理有限公司
- 代理人: 董建林; 俞翠华
- 主分类号: G01R31/02
- IPC分类号: G01R31/02 ; G01R19/165 ; G01R29/16
The invention discloses a low-current grounding rapid test pull method in an automatic scheduling system and a system thereof. The method comprises the following steps of determining a bus generating low-current grounding and setting the bus in a low-current grounding state and sending a bus low-current grounding alarm signal; according to the alarm signal, positioning a wiring diagram of a factory station where the bus is located, then aiming at an outgoing line breaker connected to the bus, carrying out remote control division operation, and when the remote control division operation of the outgoing line breaker is successful, sending a control division success message; circularly detecting whether to receive the control division success message, after the control division success message of the outgoing line breaker is received, issuing a control combination execution instruction of the breaker; and acquiring all the current buses which are in the low-current grounding state, when the buses are determined to be returned to a normal state from the low-current grounding state, setting the buses in the normal state, and simultaneously finding a low-current grounding line and sending a bus low-current grounding recovery alarm signal. By using the method and the system of the invention, non-scheduled power outage time of a user is greatly shortened and a social influence brought by non-scheduled power outage is reduced.
IPC结构图谱:
G | 物理 |
--G01 | 测量;测试 |
----G01R | 测量电变量;测量磁变量(通过转换成电变量对任何种类的物理变量进行测量参见G01类名下的 |
------G01R31/00 | 电性能的测试装置;电故障的探测装置;以所进行的测试在其他位置未提供为特征的电测试装置 |
--------G01R31/02 | .对电设备、线路或元件进行短路、断路、泄漏或不正确连接的测试 |