
基本信息:
- 专利标题: 一种电能替代实施效果的评价方法及装置
- 专利标题(英):Electric energy substitution implementation effect evaluation method and device
- 申请号:CN201710289439.4 申请日:2017-04-27
- 公开(公告)号:CN106971278A 公开(公告)日:2017-07-21
- 发明人: 陈美玲 , 张文 , 王东 , 贾素锦 , 陈光艳 , 林晶怡 , 苗博 , 陈企楚 , 朱薪志 , 付卫东 , 杨硕
- 申请人: 国网信息通信产业集团有限公司 , 北京中电普华信息技术有限公司 , 国网河北省电力公司 , 国网河北省电力公司电力科学研究院 , 中国电力科学研究院
- 申请人地址: 北京市昌平区未来科技城北区国网智能电网研究院内C座4层; ; ; ;
- 专利权人: 国网信息通信产业集团有限公司,北京中电普华信息技术有限公司,国网河北省电力公司,国网河北省电力公司电力科学研究院,中国电力科学研究院
- 当前专利权人: 国网信息通信产业集团有限公司,北京中电普华信息技术有限公司,国网河北省电力公司,国网河北省电力公司电力科学研究院,中国电力科学研究院
- 当前专利权人地址: 北京市昌平区未来科技城北区国网智能电网研究院内C座4层; ; ; ;
- 代理机构: 北京集佳知识产权代理有限公司
- 代理人: 王宝筠
- 主分类号: G06Q10/06
- IPC分类号: G06Q10/06 ; G06Q50/06
The invention provides an electric energy substitution implementation effect evaluation method and device. According to the method, firstly, a to-be-evaluated region of the electric energy substitution implementation effect is determined, the to-be-evaluated region can be in a national scope and can be in a provincial and city region scope, and customized user demands are satisfied; secondly, basic data of each electric energy substitution project is pre-processed according to a preset electric energy substitution implementation effect evaluation model, a principal component analysis method is employed to analyze the standard data after processing to acquire a score and weight of each main factor, comprehensive evaluation scores of to-be-evaluated fields can be calculated, and electric energy substitution implementation effect ranking of the to-be-evaluated fields can be determined according to the comprehensive evaluation scores. The method is advantaged in that the method is objective and scientific, a quantitative evaluation result can be realized, electric energy substitution business management personnel is facilitated to more accurately and quickly evaluate the electric energy substitution implementation effect, and pertinent business development and popularization can be carried out.
公开/授权文献:
- CN106971278B 一种电能替代实施效果的评价方法及装置 公开/授权日:2020-08-07