
基本信息:
- 专利标题: 一种浅埋暗挖地铁车站分离开敞式结构及其施工方法
- 申请号:CN201710188769.4 申请日:2017-03-27
- 公开(公告)号:CN106907159B 公开(公告)日:2020-01-14
- 发明人: 宋超业 , 贺维国 , 王蓉蓉 , 杨超峰 , 毕经东 , 刘鹏 , 史超凡 , 吕鹏 , 张坤 , 田峰 , 吕青松
- 申请人: 中铁第六勘察设计院集团有限公司
- 申请人地址: 天津市自贸区(空港经济区)环河南路88号2-3116室
- 专利权人: 中铁第六勘察设计院集团有限公司
- 当前专利权人: 中铁第六勘察设计院集团有限公司
- 当前专利权人地址: 天津市自贸区(空港经济区)环河南路88号2-3116室
- 代理机构: 北京国坤专利代理事务所
- 代理人: 黄耀钧
- 主分类号: E21D9/14
- IPC分类号: E21D9/14 ; E21D9/00 ; E21D11/10 ; E21D11/14 ; E21D11/38 ; E21D20/02
The invention provides a shallow depth excavation subway station separation open type structure and a construction method thereof and relates to the technical field of tunnel construction. The shallow depth excavation subway station separation open type structure comprises two separated symmetrically-arranged tunnels; secondary lining base plates are arranged at the bottoms of the tunnels, two secondary lining side walls are arranged above the two sides of each secondary lining base plate, horizontally-arranged middle plates and secondary lining arch parts are arranged on the middle portions and the tops of the secondary lining side walls correspondingly, arch part primary supports are arranged on the outer portions of the secondary lining arch parts, advance supports are arranged on the outer sides of the arch part primary supports, primary support large arch feet are arranged at the lower ends of the arch part primary supports, side wall primary supports are arranged below the primary support large arch feet, a plurality of pre-stressed anchor cables are arranged on each side wall primary support, and locking anchor pipes are arranged between the pre-stressed anchor cables; and base plate under layers and inverted arch primary supports are arranged below the secondary lining base plates. According to the shallow depth excavation subway station separation open type structure and the construction method thereof, an enough operation space and a high construction speed can be provided, and the purpose that rock stratum underground structure construction is conducted in a large mechanization mode is achieved.
公开/授权文献:
- CN106907159A 一种浅埋暗挖地铁车站分离开敞式结构及其施工方法 公开/授权日:2017-06-30
IPC结构图谱:
E | 固定建筑物 |
--E21 | 土层或岩石的钻进;采矿 |
----E21D | 竖井;隧道;平硐;地下室 |
------E21D9/00 | 衬砌或不衬砌的隧道或平硐;其掘进的方法或设备;隧道、平硐的设计布置 |
--------E21D9/14 | .隧道或平硐的设计布置;其他类目不包括的隧道或平硐的结构特征,例如,洞口、隧道口的日光减弱 |