
基本信息:
- 专利标题: 一种钢管桩桩底预加载装置及方法
- 专利标题(英):Pile bottom preloading device and method for steel pipe pile
- 申请号:CN201710056469.0 申请日:2017-01-25
- 公开(公告)号:CN106869117A 公开(公告)日:2017-06-20
- 发明人: 刘斌 , 潘军 , 刘建华 , 余本俊 , 耿树成 , 徐平安 , 熊世坤 , 李帅举 , 孙刘洋 , 倪宇 , 周琳
- 申请人: 中铁大桥局集团有限公司
- 申请人地址: 湖北省武汉市汉阳区汉阳大道38号
- 专利权人: 中铁大桥局集团有限公司
- 当前专利权人: 中铁大桥局集团有限公司
- 当前专利权人地址: 湖北省武汉市汉阳区汉阳大道38号
- 代理机构: 北京捷诚信通专利事务所
- 代理人: 王卫东
- 主分类号: E02D5/38
- IPC分类号: E02D5/38 ; E02D15/04
The invention discloses a pile bottom preloading device and method for a steel pipe pile. The pile bottom preloading device comprises a mudjacking pipe frame, a plurality of sets of mudjacking pipe loops, a mudjacking sleeve piece and a grouting flow distributor, wherein the mudjacking pipe frame is arranged in the steel pipe pile; the mudjacking pipe loops are fixedly arranged on the mudjacking pipe frame, and a pressure gauge and a first ball valve are arranged at an outlet of each set of mudjacking pipe loop; the bottoms of the mudjacking pipe loops are sleeved with the mudjacking sleeve piece, and vertically-downward holes are formed in the mudjacking sleeve piece; and the grouting flow distributor comprises a grout inlet and a plurality of grout outlets, a second ball valve is mounted at each grout outlet, the grout outlets are in one-to-one correspondence with the mudjacking pipe loops and are connected with the mudjacking pipe loops, and the grout inlet is connected with the mudjacking machine. According to the pile bottom preloading device and method for the steel pipe pile, by injecting cement grout into the space between an intra-pile soil plug and a concrete plug, the actual ultimate end resistance of the steel pipe pile in a stratum of an ultra-fine compact silt structure can reach the geologically-explored end resistance, and the pile end ultimate bearing capacity can be greatly improved.
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02D | 基础;挖方;填方;地下或水下结构物 |
------E02D5/00 | 基础工程专用的板桩墙,桩或其他结构构件 |
--------E02D5/22 | .桩 |
----------E02D5/24 | ..预制桩 |
------------E02D5/38 | ...用管形模或其他模子筑桩 |