![锚头置于桩身的深基坑桩锚支护体系及其实施方法](/CN/2016/1/238/images/201611194154.jpg)
基本信息:
- 专利标题: 锚头置于桩身的深基坑桩锚支护体系及其实施方法
- 专利标题(英):Deep-foundation-pit pile-anchor supporting system with anchor heads arranged on pile bodies and implementing method of system
- 申请号:CN201611194154.4 申请日:2016-12-21
- 公开(公告)号:CN106498950A 公开(公告)日:2017-03-15
- 发明人: 王海涛 , 何永 , 闫帅 , 涂兵雄 , 贾金青 , 金慧 , 吴锋 , 张小浩 , 吴跃东 , 申佳玉
- 申请人: 大连交通大学
- 申请人地址: 辽宁省大连市沙河口区黄河路794号
- 专利权人: 大连交通大学
- 当前专利权人: 大连交通大学
- 当前专利权人地址: 辽宁省大连市沙河口区黄河路794号
- 代理机构: 大连东方专利代理有限责任公司
- 代理人: 李洪福
- 主分类号: E02D17/04
- IPC分类号: E02D17/04
The invention discloses a deep-foundation-pit pile-anchor supporting system with anchor heads arranged on pile bodies and an implementing method of the system. The supporting system comprises retaining piles, anchor rods, saddle-shaped cushion blocks, anchor devices, PVC pipes, wedges and locking beams; the PVC pipes are arranged inside the retaining piles in advance; inner ends of the anchor rods penetrate through the PVC pipes and are inserted in the foundation pit wall, and outer ends of the anchor rods are fixedly connected with the anchor devices; and included angles being 15-25 degrees are formed between axes of the anchor devices and the horizontal plane and are kept consistent with inclination angles of the anchor rods. Waist beams in a traditional pile-anchor system are canceled, so that the prestress loss caused by deformation of the waist beams is avoided. The force of the anchor rods is directly transferred to the retaining piles, the anchor rods and the retaining piles can be better integrally and synergistically stressed, and a supporting structure is better in integrity, safe and reliable. A lot of connecting batten plates and welding rods are canceled, so that profile steel materials and the electricity consumption are greatly saved. Heavy and dangerous waist beam mounting work is avoided, procedures are simplified, and the construction period is shortened.
公开/授权文献:
- CN106498950B 锚头置于桩身的深基坑桩锚支护体系的实施方法 公开/授权日:2018-11-30
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02D | 基础;挖方;填方;地下或水下结构物 |
------E02D17/00 | 挖方;挖方边缘的修砌;填方 |
--------E02D17/02 | .基础坑 |
----------E02D17/04 | ..基础坑边缘的修砌或加固 |