- 专利标题: 沉管沉放的控制系统及沉管沉放方法
- 专利标题(英):Sinking pipe sinking control system and sinking pipe sinking method
- 申请号:CN201611075653.1 申请日:2016-11-29
- 公开(公告)号:CN106400841A 公开(公告)日:2017-02-15
- 发明人: 刘德进 , 冯海暴 , 苏长玺 , 国强 , 曲俐俐 , 马宗田 , 李增军 , 冯甲鑫 , 张乃受 , 孙靓 , 毛轶伦
- 申请人: 中交一航局第二工程有限公司 , 中交第一航务工程局有限公司
- 申请人地址: 山东省青岛市市南区福州南路16号
- 专利权人: 中交一航局第二工程有限公司,中交第一航务工程局有限公司
- 当前专利权人: 中交第一航务工程局有限公司,中交一航局第二工程有限公司
- 当前专利权人地址: 山东省青岛市市南区福州南路16号
- 代理机构: 青岛联信知识产权代理事务所
- 代理人: 王月玲; 王中云
- 主分类号: E02D29/073
- IPC分类号: E02D29/073
The invention proposes a sinking pipe sinking control system and a sinking pipe sinking method, and belongs to the technical field of sinking pipe tunnel construction. The sinking pipe sinking control system comprises a sinking barge, and a sinking pipe positioned below the sinking barge; multiple lifting cables for controlling the sinking pipe to move up and down are arranged at the bottom of the sinking barge, and are uniformly distributed at the bottom of the sinking barge; the sinking pipe is connected with the multiple lifting cables; at least two first control units for controlling the sinking pipe to swing left and right are arranged between the bottom of the sinking barge and the sinking pipe; the first control units are arranged in the left-right direction; the multiple first control units are uniformly distributed between the sinking barge and the sinking pipe; a second control unit for controlling the sinking pipe to swing front and back is arranged between the bottom of the sinking barge and the sinking pipe; and the second control unit is arranged in the front-back direction. The sinking pipe sinking control system can control the sinking pipe to swing in the sinking process, keeps the sinking pipe stable, and guarantees the sinking pipe to sink in a preset position.
公开/授权文献:
- CN106400841B 沉管沉放的控制系统及沉管沉放方法 公开/授权日:2018-08-24
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02D | 基础;挖方;填方;地下或水下结构物 |
------E02D29/00 | 地下或水下结构物;挡土墙 |
--------E02D29/045 | .地下结构物,例如,建于露天的或通过破坏定位线的地基表面的方法修建的隧道或廊道;它们的修建方法 |
----------E02D29/073 | ..由单独沉到或放到水底的构件装配成的隧道或模板,例如,在预制槽中 |